Information Technology Data Center is a data center run by Phillips Exeter Academy in Exeter, Rockingham County, New Hampshire. It is mapped as 1 building covering about 7,700 sq ft. Its power comes off the New England grid (ISO New England), which runs on 56% natural gas, 23% nuclear and 8% hydroelectric.
This data centerOther data centersPower plants (colored by fuel)
| County | Rockingham County, New Hampshire |
|---|---|
| Coordinates | 42.98215, -70.95052 |
| On OpenStreetMap | way/589070714 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's New England grid region, and the county's largest utility is on the ISO New England grid. In 2023, the region's electricity was 56% natural gas, 23% nuclear, 8% hydroelectric and 4% biomass.
Each megawatt-hour carried about 537 lb of CO₂, 30% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Co of NH | 19.7¢ | 19.3¢ |
| New Hampshire Elec Coop Inc | 22.1¢ | 16.9¢ |
| Unitil Energy Systems | 23.5¢ | 19.6¢ |
| Liberty Utilities (Granite State Electri | 18.1¢ | 17.7¢ |
Utilities that report serving Rockingham County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Hampton Facility | Natural Gas | 5.0 MW | 6.3 mi |
| Seabrook | Nuclear | 1,242 MW | 7.7 mi |
| True North | Solar | 4.8 MW | 9.7 mi |
| Kearsarge Amesbury Hybrid | Solar | 4.9 MW | 10.0 mi |
| Merrimac Solar | Solar | 1.5 MW | 10.5 mi |
| Hunt Road Solar | Solar | 4.5 MW | 10.5 mi |
| UNH 7.9 MW Plant | Biomass | 7.9 MW | 10.7 mi |
| Newington Energy Center | Natural Gas | 606 MW | 11.2 mi |
| Newington | Oil | 414 MW | 11.5 mi |
| Schiller | Oil | 21.2 MW | 11.6 mi |
The largest power plant within 50 miles is Seabrook, a 1,242 MW nuclear plant 8 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
Data centers in New Hampshire · Data centers in Rockingham County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.