Hampton Facility is a natural gas power plant in New Hampshire with a nameplate capacity of 5.0 MW. It generates roughly 27.3k MWh per year — enough to power about 2,599 average U.S. homes.
Its capacity factor of 62% puts it in the middle range — running steadily but not full-time. At 710 lb CO₂/MWh, its emission rate sits below the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, Hampton Facility could make 43.8k MWh. In 2023 it made 27.3k MWh — the same as running at full power 62 hours in every 100.
Mid-meritCapacity factor 62%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 11 Merrill Industrial Drive |
|---|---|
| City | Hampton |
| County | Rockingham County |
| State | New Hampshire |
| ZIP | 03842 |
| Coordinates | 42.93830, -70.84060 |
| Operator | Foss Manufacturing Company LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN8 | Natural Gas Fired Combustion Turbine | Natural Gas | 5.0 MW | Operating | 2000 |
| CO₂ | 9.7k metric tons |
|---|---|
| NOₓ | 27 metric tons |
| CO₂ Rate | 710 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | NPCC |
|---|---|
| Balancing Authority | ISO New England Inc. |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Information Technology Data Center | 6.3 mi |
| FirstLight data center, 77 Aviation Avenue, Portsmouth | 9.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map