Lumos Networks is a data center in Lynchburg, Lynchburg (city), Virginia. Its power comes off the Ohio Valley grid, which runs on 38% natural gas, 28% nuclear and 25% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Lynchburg (city), Virginia |
|---|---|
| Coordinates | 37.41569, -79.14271 |
| On OpenStreetMap | node/5225685660 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.
Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Reusens | Hydroelectric | 12.5 MW | 4.1 mi |
| Depot Solar Center, LLC | Solar | 15.0 MW | 9.7 mi |
| Coleman Falls | Hydroelectric | 1.5 MW | 10.6 mi |
| Holcomb Rock | Hydroelectric | 1.8 MW | 10.6 mi |
| Amherst Solar Facility (VA) | Solar | 4.9 MW | 11.8 mi |
| Georgia-Pacific Big Island | Natural Gas | 7.9 MW | 14.3 mi |
| Snowden | Hydroelectric | 5.0 MW | 16.6 mi |
| Cushaw | Hydroelectric | 7.5 MW | 17.9 mi |
| Bedford Solar (Oppidum) | Solar | 3.0 MW | 19.4 mi |
| Orange Street G1 | Oil | 4.8 MW | 21.0 mi |
The largest power plant within 50 miles is Clover, a 848 MW coal plant 45 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.