Nautilus Cryptomine is a data center in Beach Haven, Luzerne County, Pennsylvania. It is mapped as 2 buildings covering about 2.6 acres (114,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Luzerne County, Pennsylvania |
|---|---|
| Coordinates | 41.08297, -76.15118 |
| On OpenStreetMap | way/1334234454, way/1334234455 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.
Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| PPL Electric Utilities Corp | 13.9¢ | 10.9¢ |
| UGI Utilities, Inc | 13.2¢ | 8.8¢ |
| Claverack Rural Elec Coop Inc | 13.8¢ | 9.1¢ |
Utilities that report serving Luzerne County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| TalenEnergy Susquehanna | Nuclear | 2,532 MW | 0.7 mi |
| Moxie Freedom Generation Plant | Natural Gas | 1,105 MW | 2.1 mi |
| Hunlock Power Station | Natural Gas | 146 MW | 9.2 mi |
| Hunlock Unit 4 | Natural Gas | 44.0 MW | 9.3 mi |
| Hazle Spindle | Other Fossil | 20.0 MW | 10.7 mi |
| Romark PA Solar | Solar | 1.8 MW | 11.7 mi |
| Hazelton | Natural Gas | 172 MW | 12.1 mi |
| Locust Ridge | Wind | 26.0 MW | 15.8 mi |
| Locust Ridge II LLC | Wind | 102 MW | 16.7 mi |
| St Nicholas Cogen Project | Coal | 99.2 MW | 18.1 mi |
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Amazon AWS PHL | 6.2 ac | 0.4 mi |
Data centers in Pennsylvania · Data centers in Luzerne County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.