Data Centers in Luzerne County, PA

2 data centers are mapped in Luzerne County, Pennsylvania: 3 buildings covering about 8.8 acres (384,000 sq ft) of roof. Operators include Amazon Web Services. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings3mapped footprints
Roof area8.8 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Luzerne County

Data centerOperatorCityRoof area
Amazon AWS PHLAmazon Web ServicesBerwick6.2 ac
Nautilus CryptomineOperator not recordedBeach Haven2.6 ac

What the grid here generates

Data centers in Luzerne County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Luzerne County

UtilityTypeGridBusiness rateIndustrial rate
PPL Electric Utilities CorpInvestor OwnedPJM Interconnection13.9¢10.9¢
UGI Utilities, IncInvestor OwnedPJM Interconnection13.2¢8.8¢
Claverack Rural Elec Coop IncCooperativePJM Interconnection13.8¢9.1¢

Utilities that report serving Luzerne County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Luzerne County

PlantFuelCapacity
TalenEnergy SusquehannaNuclear2,532 MW
Moxie Freedom Generation PlantNatural Gas1,105 MW
HazeltonNatural Gas172 MW
Hunlock Power StationNatural Gas146 MW
Hunlock Unit 4Natural Gas44.0 MW
Wind Park Bear CreekWind24.0 MW
Hazle SpindleOther Fossil20.0 MW
Romark PA SolarSolar1.8 MW

All power plants in Luzerne County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me