OVH US East Vint Hill

OVH US East Vint Hill is a data center in Warrenton, Fauquier County, Virginia. It is mapped as 1 building covering about 2.0 acres (85,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorOperator not recordedas mapped
Roof area2.0 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant3.0 miWater Treatment Plant Gen…

Location

This data centerOther data centersPower plants (colored by fuel)

Address6872 Watson Court, Warrenton VA 20187
CountyFauquier County, Virginia
Coordinates38.74741, -77.67438
On OpenStreetMapway/225745958

What powers OVH US East Vint Hill

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Fauquier County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢
Rappahannock Electric CoopCooperativePJM Interconnection12.1¢8.8¢

Utilities that report serving Fauquier County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Water Treatment Plant GeneratorsOil1.8 MW3.0 mi
Energix Nokesville, LLCSolar20.0 MW6.8 mi
VA- US Foods- ManassasSolar2.0 MW7.0 mi
Godwin Drive PlantOil6.3 MW9.0 mi
VMEA 1 Credit GenOil13.2 MW9.0 mi
VMEA Peaking GenOil6.4 MW9.0 mi
Gateway GenOil3.6 MW9.0 mi
Dominion/Lo MarOil19.2 MW9.5 mi
Church Street PlantOil4.3 MW11.4 mi
Remington Solar FacilitySolar20.0 MW14.8 mi

The largest power plant within 50 miles is North Anna, a 1,960 MW nuclear plant 48 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Amazon IAD-198Amazon Web Services2.5 ac4.7 mi
Amazon IAD-197Amazon Web Services3.0 ac4.7 mi
Amazon IAD-195Amazon Web Services3.0 ac4.7 mi
Amazon IAD-196Amazon Web Services2.9 ac4.7 mi
Digital Realty VA4Digital Realty5.3 ac4.8 mi
Amazon Web Services data center, HaymarketAmazon Web Services0.3 ac4.8 mi
Amazon IAD-64Amazon Web Services3.4 ac4.8 mi
Amazon data center, HaymarketAmazon—4.9 mi
Amazon IAD-84Amazon Web Services3.5 ac4.9 mi
Amazon IAD-55Amazon Web Services5.2 ac4.9 mi
Amazon IAD-94Amazon Web Services3.4 ac5.0 mi
NTT VA10NTT11 ac5.0 mi

More

Data centers in Virginia · Data centers in Fauquier County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me