QTS Manassas DC3

QTS Manassas DC3 is a data center run by Quality Technology Services in Manassas, Prince William County, Virginia. It is mapped as 1 building covering about 3.1 acres (137,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorQuality Technology Servicesas mapped
Roof area3.1 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant0.9 miGodwin Drive Plant

Location

This data centerOther data centersPower plants (colored by fuel)

Address9450 Godwin Drive, Manassas VA 20110
CountyPrince William County, Virginia
Coordinates38.75334, -77.51098
On OpenStreetMapway/1287260558

What powers QTS Manassas DC3

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Prince William County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Prince William County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Godwin Drive PlantOil6.3 MW0.9 mi
VMEA 1 Credit GenOil13.2 MW0.9 mi
VMEA Peaking GenOil6.4 MW0.9 mi
Dominion/Lo MarOil19.2 MW1.0 mi
Gateway GenOil3.6 MW1.9 mi
Church Street PlantOil4.3 MW2.6 mi
VA- US Foods- ManassasSolar2.0 MW3.3 mi
Water Treatment Plant GeneratorsOil1.8 MW5.9 mi
Energix Nokesville, LLCSolar20.0 MW7.2 mi
Covanta Fairfax EnergyBiomass124 MW15.1 mi

The largest power plant within 50 miles is Chalk Point Power, a 1,825 MW natural gas plant 47 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
QTS Manassas DC2Quality Technology Services2.9 ac0.1 mi
QTS Manassas DC1Quality Technology Services2.8 ac0.1 mi
QTS Manassas DC5Quality Technology Services3.5 ac0.4 mi
STACK NVA05ASTACK Infrastructure3.2 ac0.5 mi
STACK NVA05CSTACK Infrastructure3.6 ac0.5 mi
STACK NVA05BSTACK Infrastructure4.1 ac0.6 mi
Amazon IAD-105Amazon Web Services4.9 ac0.6 mi
Amazon Web Services data center, ManassasAmazon Web Services4.9 ac0.6 mi
Amazon IAD-106Amazon Web Services4.7 ac0.6 mi
Amazon IAD-104Amazon Web Services4.9 ac0.6 mi
Amazon IAD-130Amazon Web Services2.4 ac0.7 mi
Amazon IAD-131Amazon Web Services2.4 ac0.7 mi
Amazon Web Services data center, Manassas under constructionAmazon Web Services8.4 ac0.9 mi
Digital Realty IAD53Digital Realty2.2 ac1.0 mi
Digital Realty IAD50Digital Realty9.3 ac1.1 mi

And 47 more within 5 miles.

More

Data centers in Virginia · Data centers in Prince William County · All Quality Technology Services data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me