SAP COS02

SAP COS02 is a data center in Colorado Springs, El Paso County, Colorado. It is mapped as 1 building covering about 1.1 acres (47,000 sq ft). Its power comes off the Rocky Mountains grid (Public Service Co. of Colorado (Xcel)), which runs on 32% coal, 26% natural gas and 26% wind.

OperatorSAPas mapped
Roof area1.1 ac1 building
Grid CO₂1,036 lbper MWh, RMPA region
Nearest plant2.4 miAFA Solar Farm

Location

This data centerOther data centersPower plants (colored by fuel)

CountyEl Paso County, Colorado
Coordinates38.98879, -104.78641
On OpenStreetMapway/813532303

What powers SAP COS02

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Rocky Mountains grid region, and the county's largest utility is on the Public Service Co. of Colorado (Xcel) grid. In 2023, the region's electricity was 32% coal, 26% natural gas, 26% wind and 11% hydroelectric.

Each megawatt-hour carried about 1,036 lb of CO₂, 35% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 32%Natural Gas 26%Wind 26%Hydroelectric 11%Solar 5%

Share of electricity generated in EPA's Rocky Mountains grid region (RMPA) in 2023, from eGRID. 67.7 TWh from 310 plants.

Utilities that serve El Paso County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Co of ColoradoInvestor OwnedPublic Service Co. of Colorado (Xcel)11.8¢7.7¢
City of Colorado Springs - (CO)MunicipalWestern Area Power Administration - Rocky Mountain Region9.6¢9.2¢
CORE Electric CooperativeCooperativePublic Service Co. of Colorado (Xcel)12.3¢9.4¢
Black Hills Colorado Electric, LLCInvestor OwnedPublic Service Co. of Colorado (Xcel)12.1¢9.9¢
Mountain View Elec Assn, IncCooperativeWestern Area Power Administration - Rocky Mountain Region13.1¢8.6¢
City of FountainMunicipalPublic Service Co. of Colorado (Xcel)11.7¢—
Southeast Colorado Power AssnCooperativeWestern Area Power Administration - Rocky Mountain Region13.0¢13.6¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Rocky Mountain Region3.0¢2.6¢

Utilities that report serving El Paso County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
AFA Solar FarmSolar5.5 MW2.4 mi
TeslaHydroelectric26.6 MW6.2 mi
Jackson Fuller Energy StorageBattery Storage100 MW9.2 mi
South Plant (CO)Natural Gas245 MW11.6 mi
Manitou SpringsHydroelectric5.6 MW12.1 mi
Ruxton ParkHydroelectric1.0 MW14.3 mi
Pikes Peak Solar Garden 1 LLC CSGSolar2.0 MW15.0 mi
Fort Carson Battery Energy Storage SysteOther Fossil4.2 MW16.8 mi
Carson Solar ISolar2.0 MW18.4 mi
Ray D NixonCoal283 MW24.9 mi

The largest power plant within 50 miles is Front Range Power Plant, a 554 MW natural gas plant 25 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Walmart Colorado Data CenterWalmart5.0 ac0.2 mi

More

Data centers in Colorado · Data centers in El Paso County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me