4 data centers are mapped in El Paso County, Colorado: 4 buildings covering about 8.8 acres (382,000 sq ft) of roof. Operators include SAP, Walmart. The county is in EPA's Rocky Mountains grid region, whose electricity is 32% coal, 26% natural gas and 26% wind, at 1,036 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Walmart Colorado Data Center | Colorado Springs | 5.0 ac |
| T5@Colorado Springs | Colorado Springs | 1.7 ac |
| SAP COS02 | Colorado Springs | 1.1 ac |
| 600 | Colorado Springs | 1.0 ac |
Data centers in El Paso County draw from the regional grid. In 2023, electricity in EPA's Rocky Mountains region was 32% coal, 26% natural gas, 26% wind and 11% hydroelectric, at 1,036 lb of CO₂ per megawatt-hour, 35% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Rocky Mountains grid region (RMPA) in 2023, from eGRID. 67.7 TWh from 310 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Co of Colorado | 11.8¢ | 7.7¢ |
| City of Colorado Springs - (CO) | 9.6¢ | 9.2¢ |
| CORE Electric Cooperative | 12.3¢ | 9.4¢ |
| Black Hills Colorado Electric, LLC | 12.1¢ | 9.9¢ |
| Mountain View Elec Assn, Inc | 13.1¢ | 8.6¢ |
| City of Fountain | 11.7¢ | — |
| Southeast Colorado Power Assn | 13.0¢ | 13.6¢ |
| WAPA-- Western Area Power Administration | 3.0¢ | 2.6¢ |
Utilities that report serving El Paso County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Front Range Power Plant | Natural Gas | 554 MW |
| Ray D Nixon | Coal | 283 MW |
| Golden West Power Partners LLC | Wind | 250 MW |
| South Plant (CO) | Natural Gas | 245 MW |
| Fountain Valley Power Facility | Natural Gas | 228 MW |
| Pike Solar Hybrid | Solar | 175 MW |
| Jackson Fuller Energy Storage | Battery Storage | 100 MW |
| Palmer Solar | Solar | 60.0 MW |
| Grazing Yak Solar | Solar | 35.0 MW |
| Tesla | Hydroelectric | 26.6 MW |
| Clear Spring Ranch PV Project | Solar | 10.0 MW |
| Manitou Springs | Hydroelectric | 5.6 MW |
| AFA Solar Farm | Solar | 5.5 MW |
| Fort Carson Battery Energy Storage Syste | Other Fossil | 4.2 MW |
| Carson Solar I | Solar | 2.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.