2 data centers are mapped in Contra Costa County, California: 2 buildings covering about — of roof. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Open Computing Facility | Berkeley | — |
| e360 | Concord | — |
Data centers in Contra Costa County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Pacific Gas & Electric Co. | 39.5¢ | 33.1¢ |
| WAPA-- Western Area Power Administration | 4.6¢ | 2.9¢ |
Utilities that report serving Contra Costa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Delta Energy Center | Natural Gas | 944 MW |
| Marsh Landing Generating Station | Natural Gas | 828 MW |
| Los Medanos Energy Center | Natural Gas | 678 MW |
| Gateway Generating Station | Natural Gas | 620 MW |
| Crockett Cogen Project | Natural Gas | 247 MW |
| Diablo Energy Storage | Other Fossil | 200 MW |
| Richmond Cogen | Natural Gas | 174 MW |
| Marathon Bay Area Cogen | Natural Gas | 114 MW |
| Martinez Refining | Natural Gas | 100 MW |
| Vasco Winds | Wind | 78.2 MW |
| Phillips 66 Rodeo Refinery | Other Fossil | 54.9 MW |
| Riverview Energy Center | Natural Gas | 47.0 MW |
| Buena Vista Energy LLC | Wind | 38.0 MW |
| P66 Rodeo Solar | Solar | 30.2 MW |
| Columbia Solar Energy, LLC | Solar | 19.2 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.