5 data centers are mapped in San Diego County, California: 5 buildings covering about 4.8 acres (211,000 sq ft) of roof. Operators include American Telephone & Telegraph, EdgeConneX. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| AT&T Center | San Diego | 2.0 ac |
| LightEdge SAN1 | San Diego | 1.9 ac |
| EdgeConneX San Diego | San Diego | 0.9 ac |
| SDSU Computer Room | San Diego | — |
| Data center, Vista | Vista | — |
Data centers in San Diego County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Pacific Gas & Electric Co. | 39.5¢ | 33.1¢ |
| Southern California Edison Co | 23.1¢ | 20.6¢ |
| San Diego Gas & Electric Co | 35.5¢ | 26.2¢ |
| Imperial Irrigation District | 18.2¢ | 20.8¢ |
| City of Escondido - (CA) | 5.2¢ | — |
Utilities that report serving San Diego County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Otay Mesa Generating Project | Natural Gas | 711 MW |
| Carlsbad Energy Center | Natural Gas | 659 MW |
| Palomar Energy | Natural Gas | 559 MW |
| Pio Pico Energy Center | Natural Gas | 395 MW |
| Nighthawk Energy Storage, LLC | Battery Storage | 300 MW |
| Gateway Energy Storage System | Other Fossil | 250 MW |
| Peregrine Energy Storage LLC | Battery Storage | 200 MW |
| Tule Wind LLC | Wind | 143 MW |
| Orange Grove Peaking Facility | Natural Gas | 118 MW |
| Border Hybrid Energy Center | Natural Gas | 115 MW |
| Miramar Energy Facility | Natural Gas | 106 MW |
| Ocotillo Wells | Solar | 100 MW |
| Pome BESS | Battery Storage | 100 MW |
| Larkspur Energy Facility | Natural Gas | 99.8 MW |
| Valley Center 85 | Other Fossil | 85.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.