4 data centers are mapped in Newton County, Georgia: 4 buildings covering about 40.4 acres (1,759,000 sq ft) of roof. Operators include Meta. The county is in EPA's Southeast grid region, whose electricity is 55% natural gas, 20% nuclear and 15% coal, at 840 lb of CO₂ per megawatt-hour.
Data centerUnder construction
| Data center | City | Roof area |
|---|---|---|
| Meta data center, Social Circle | Social Circle | 17 ac |
| Meta data center, Social Circle | Social Circle | 15 ac |
| Meta data center, Rutledge | Rutledge | 7.8 ac |
| Meta Stanton Springs Data Center | Social Circle | — |
Data centers in Newton County draw from the regional grid. In 2023, electricity in EPA's Southeast region was 55% natural gas, 20% nuclear, 15% coal and 4% solar, at 840 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Georgia Power Co | 11.7¢ | 7.1¢ |
| Walton Electric Member Corp | 6.9¢ | 6.5¢ |
| Snapping Shoals El Member Corp | 11.3¢ | 7.4¢ |
| Central Georgia El Member Corp | 11.2¢ | 7.1¢ |
| City of Covington - (GA) | 13.4¢ | 7.8¢ |
Utilities that report serving Newton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.