Data Centers in Eaton County, MI

2 data centers are mapped in Eaton County, Michigan: 2 buildings covering about 2.2 acres (95,000 sq ft) of roof. The county is in EPA's Michigan grid region, whose electricity is 49% natural gas, 25% coal and 10% nuclear, at 962 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area2.2 acbuilding footprints
GridMISO (Midcontinent ISO)largest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Eaton County

Data centerOperatorCityRoof area
Liquid Web, IncOperator not recordedLansing1.7 ac
Liquid WebOperator not recordedDimondale0.5 ac

What the grid here generates

Data centers in Eaton County draw from the regional grid. In 2023, electricity in EPA's Michigan region was 49% natural gas, 25% coal, 10% nuclear and 9% wind, at 962 lb of CO₂ per megawatt-hour, 26% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 49%Coal 25%Nuclear 10%Wind 9%

Share of electricity generated in EPA's Michigan grid region (RFCM) in 2023, from eGRID. 92.4 TWh from 221 plants.

Utilities that serve Eaton County

UtilityTypeGridBusiness rateIndustrial rate
Consumers Energy Co - (MI)Investor OwnedMISO (Midcontinent ISO)15.0¢8.4¢
City of Lansing - (MI)MunicipalMISO (Midcontinent ISO)16.3¢13.5¢
Tri-County Electric Coop (MI)CooperativeMISO (Midcontinent ISO)18.2¢10.5¢

Utilities that report serving Eaton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Eaton County

PlantFuelCapacity
Delta Energy ParkNatural Gas263 MW
Delta Solar Power IISolar15.9 MW
Delta Solar Power ISolar8.1 MW

All power plants in Eaton County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me