Liquid Web, Inc is a data center in Lansing, Eaton County, Michigan. It is mapped as 1 building covering about 1.7 acres (72,000 sq ft). Its power comes off the Michigan grid (MISO (Midcontinent ISO)), which runs on 49% natural gas, 25% coal and 10% nuclear.
This data centerOther data centersPower plants (colored by fuel)
| Address | 2703 Ena Drive, Lansing MI 48917 |
|---|---|
| County | Eaton County, Michigan |
| Coordinates | 42.70547, -84.66618 |
| Website | www.liquidweb.com/ |
| On OpenStreetMap | way/545060574 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Michigan grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 49% natural gas, 25% coal, 10% nuclear and 9% wind.
Each megawatt-hour carried about 962 lb of CO₂, 26% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Michigan grid region (RFCM) in 2023, from eGRID. 92.4 TWh from 221 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Consumers Energy Co - (MI) | 15.0¢ | 8.4¢ |
| City of Lansing - (MI) | 16.3¢ | 13.5¢ |
| Tri-County Electric Coop (MI) | 18.2¢ | 10.5¢ |
Utilities that report serving Eaton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Delta Energy Park | Natural Gas | 263 MW | 1.1 mi |
| Delta Solar Power II | Solar | 15.9 MW | 1.7 mi |
| Delta Solar Power I | Solar | 8.1 MW | 1.8 mi |
| Lansing BWL REO Town Plant | Natural Gas | 98.0 MW | 5.9 mi |
| Grand River | Biomass | 3.2 MW | 6.1 mi |
| T B Simon Power Plant | Natural Gas | 128 MW | 9.3 mi |
| Spartan PV 1, LLC | Solar | 10.5 MW | 9.3 mi |
| Blue Elk III Solar, LLC | Solar | 20.0 MW | 13.6 mi |
| Frank Jenkins | Oil | 3.8 MW | 16.2 mi |
| Blue Elk II Solar, LLC | Solar | 20.0 MW | 16.9 mi |
The largest power plant within 50 miles is Renaissance Power Plant, a 782 MW natural gas plant 34 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Liquid Web | 0.5 ac | 1.7 mi |
Data centers in Michigan · Data centers in Eaton County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.