Blue Elk Iii Solar, Llc

☀ SolarIPP Non-CHP20 MW capacity

107th largest plant in Michigan · 4596th nationally

Blue Elk Iii Solar, Llc is a solar power plant in Michigan with a nameplate capacity of 20.0 MW. It generates roughly 433 MWh per year — enough to power about 41 average U.S. homes.

Its capacity factor of 0% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%0%
Peaking — intermittent or backup
Capacity20 MWnameplate
Annual Generation433 MWhEPA eGRID
Capacity Factor0%of theoretical max
Annual CO₂metric tons

Location

Plant NameBlue Elk Iii Solar, Llc
OperatorBlue Elk Iii Solar, Llc
CityEaton Rapids
CountyIngham County
StateMichigan
ZIP48827
Coordinates42.51600, -84.59300

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalHydroelectricSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
BEIIISolar PhotovoltaicSolar20.0 MWOperating2023

Grid context

NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Ingham County

View all plants in Ingham County →