Data Centers in Carver County, MN

4 data centers are mapped in Carver County, Minnesota: 4 buildings covering about 14.3 acres (622,000 sq ft) of roof. Operators include Flexential, Stream. The county is in EPA's Upper Midwest grid region, whose electricity is 38% wind, 35% coal and 13% natural gas, at 920 lb of CO₂ per megawatt-hour.

Sites4mapped data centers
Buildings4mapped footprints
Roof area14 acbuilding footprints
GridMISO (Midcontinent ISO)largest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Carver County

Data centerOperatorCityRoof area
UHG Data CenterOperator not recordedChaska6.9 ac
Flexential Minneapolis - ChaskaFlexentialChaska3.1 ac
Lightedge Data CenterOperator not recordedChaska2.8 ac
StreamData CenterStreamChaska1.5 ac

What the grid here generates

Data centers in Carver County draw from the regional grid. In 2023, electricity in EPA's Upper Midwest region was 38% wind, 35% coal, 13% natural gas and 8% nuclear, at 920 lb of CO₂ per megawatt-hour, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

Utilities that serve Carver County

UtilityTypeGridBusiness rateIndustrial rate
Northern States Power Co - MinnesotaInvestor OwnedMISO (Midcontinent ISO)12.8¢9.7¢
Wright-Hennepin Coop Elec AssnCooperativeMISO (Midcontinent ISO)11.6¢10.2¢
Minnesota Valley Electric CoopCooperativeMISO (Midcontinent ISO)10.5¢—
City of Chaska - (MN)MunicipalMISO (Midcontinent ISO)12.8¢12.9¢

Utilities that report serving Carver County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Carver County

PlantFuelCapacity
St BonifaciusOil61.2 MW
Minnesota RiverNatural Gas49.0 MW
West Waconia SolarSolar8.5 MW
BentonSun LLCSolar5.0 MW
Nesvold Watertown SolarSolar5.0 MW
Lind Solar CSGSolar4.9 MW
Carver Gladden CSGSolar3.0 MW
Porter Way Community Solar GardenSolar3.0 MW
New Germany Community Solar GardenSolar1.0 MW
Lake Waconia Community Solar GardenSolar1.0 MW
Lake Waconia IV Community Solar GardenSolar1.0 MW
USS Lake Patterson Solar CSGSolar1.0 MW
USS King 2 CSGSolar1.0 MW
USS Eggo Solar CSGSolar1.0 MW
USS DVL Solar CSGSolar1.0 MW

All power plants in Carver County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me