Electric generating plantEIA plant no. 61572

Lake Waconia Community Solar Garden

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
1
In service since
2018
Operator
Lake Waconia Solar LLC
Location
Waconia, Carver County, Minnesota
Rated 446th largest in Minnesota · 13806th of 14,761 in the U.S. · by nameplate

Lake Waconia Community Solar Garden is a solar power plant in Minnesota with a nameplate capacity of 1.0 MW. It generates roughly 785 MWh per year — enough to power about 74 average U.S. homes.

Its capacity factor of 9% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Lake Waconia Community Solar Garden could make 8.8k MWh. In 2023 it made 785 MWh — the same as running at full power 9 hours in every 100.

Nameplate, full year8.8k MWh1.0 MW × 8,760 hours
Actually generated785 MWhEPA eGRID, 2023 · ≈74 homes

Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolar

Location

Address7190 County Rd 10N
CityWaconia
CountyCarver County
StateMinnesota
ZIP55387
Coordinates44.87496, -93.81501
OperatorLake Waconia Solar LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
38610Solar PhotovoltaicSolar1.0 MWOperating2018

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Carver County

View all plants in Carver County →

Data centers near Lake Waconia Community Solar Garden

Data centerOperatorDistance
Lightedge Data CenterNot recorded9.8 mi
StreamData CenterStream9.9 mi
UHG Data CenterNot recorded10.0 mi
Flexential Minneapolis - ChaskaFlexential10.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map