2 data centers are mapped in Erie County, New York: 2 buildings covering about 41,700 sq ft of roof. The county is in EPA's Upstate New York grid region, whose electricity is 33% hydroelectric, 32% nuclear and 25% natural gas, at 241 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Data center, 350 Crosspoint Parkway, Getzville | Getzville | 1.0 ac |
| Frontier Science | Amherst | — |
Data centers in Erie County draw from the regional grid. In 2023, electricity in EPA's Upstate New York region was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind, at 241 lb of CO₂ per megawatt-hour, 69% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Niagara Mohawk Power Corp. | 10.4¢ | 6.0¢ |
| New York State Elec & Gas Corp | 15.0¢ | 12.5¢ |
Utilities that report serving Erie County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Indeck Yerkes Energy Center | Natural Gas | 59.9 MW |
| Steel Winds Wind Farm | Wind | 20.0 MW |
| NY6 Battery | Other Fossil | 20.0 MW |
| Steel Winds II | Wind | 15.0 MW |
| Chaffee Gas Recovery | Biomass | 6.4 MW |
| Corning Riverview (CSG) | Solar | 5.0 MW |
| Main Rd Community Solar | Solar | 5.0 MW |
| DOCCS Wende | Solar | 5.0 MW |
| Millersport GM 1 | Solar | 5.0 MW |
| Amherst Community Solar | Solar | 5.0 MW |
| NY Grand Island 871 Whitehaven Rd Solar | Solar | 5.0 MW |
| NY Lancaster Gunnville Rd Site 1 Solar C | Solar | 5.0 MW |
| Broadway CDG Solar LLC | Solar | 5.0 MW |
| New Road | Solar | 5.0 MW |
| Bullis Road Solar (CSG) | Solar | 4.5 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.