Electric generating plantEIA plant no. 65309

Millersport GM 1

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2023
Operator
Altus Power America Management, LLC
Location
Amherst, Erie County, New York
Rated 308th largest in New York · 7466th of 14,761 in the U.S. · by nameplate

Millersport GM 1 is a solar power plant in New York with a nameplate capacity of 5.0 MW. It generates roughly 6.4k MWh per year — enough to power about 612 average U.S. homes.

Its capacity factor of 15% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Millersport GM 1 could make 43.8k MWh. In 2023 it made 6.4k MWh — the same as running at full power 15 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated6.4k MWhEPA eGRID, 2023 · ≈612 homes

Peaking or variableCapacity factor 15%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBiomass

Location

Address1 Flint Road
CityAmherst
CountyErie County
StateNew York
ZIP14228
Coordinates42.99208, -78.79084
OperatorAltus Power America Management, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
532Solar PhotovoltaicSolar5.0 MWOperating2023

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Erie County

View all plants in Erie County →

Data centers near Millersport GM 1

Data centerOperatorDistance
Frontier ScienceNot recorded1.1 mi
Data center, 350 Crosspoint Parkway, GetzvilleNot recorded4.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more