Data Centers in Ellis County, TX

4 data centers are mapped in Ellis County, Texas: 15 buildings covering about 77.7 acres (3,385,000 sq ft) of roof. Operators include Google. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.

Sites4mapped data centers
Buildings15mapped footprints
Roof area78 acbuilding footprints
GridERCOTlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Ellis County

Data centerOperatorCityRoof area
Compass Data CenterOperator not recordedRed Oak47 ac
Google data center, VenusGoogleVenus13 ac
Compass Data CenterOperator not recordedRed Oak12 ac
Google data center, Red OakGoogleRed Oak6.6 ac

What the grid here generates

Data centers in Ellis County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Ellis County

UtilityTypeGridBusiness rateIndustrial rate
United Electric Coop Service Inc - (TX)CooperativeERCOT12.4¢9.3¢
HILCO Electric Cooperative, Inc.CooperativeERCOT14.5¢9.8¢
Navarro County Elec Coop, IncCooperativeERCOT14.7¢7.3¢

Utilities that report serving Ellis County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Ellis County

PlantFuelCapacity
Midlothian Energy FacilityNatural Gas1,734 MW
Ennis Power Company LLCNatural Gas418 MW
Desert Willow Energy StorageBattery Storage150 MW
Elm Branch Solar 1Solar135 MW
Ellis Solar LLCSolar80.0 MW

All power plants in Ellis County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me