Google data center, Venus

Google data center, Venus is a data center in Venus, Ellis County, Texas. It is mapped as 3 buildings covering about 12.9 acres (563,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorGoogleas mapped
Roof area13 ac3 buildings
Grid CO₂733 lbper MWh, ERCT region
Nearest plant0.9 miMidlothian Energy Facility

Location

This data centerOther data centersPower plants (colored by fuel)

CountyEllis County, Texas
Coordinates32.44131, -97.06190
On OpenStreetMapway/844386860, way/844386861, way/1458626323

What powers Google data center, Venus

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Ellis County

UtilityTypeGridBusiness rateIndustrial rate
United Electric Coop Service Inc - (TX)CooperativeERCOT12.4¢9.3¢
HILCO Electric Cooperative, Inc.CooperativeERCOT14.5¢9.8¢
Navarro County Elec Coop, IncCooperativeERCOT14.7¢7.3¢

Utilities that report serving Ellis County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Midlothian Energy FacilityNatural Gas1,734 MW0.9 mi
Desert Willow Energy StorageBattery Storage150 MW1.0 mi
Ellis Solar LLCSolar80.0 MW1.8 mi
Heb00750Natural Gas1.2 MW9.2 mi
Wal284Natural Gas1.2 MW10.1 mi
Wal3285Natural Gas1.2 MW12.7 mi
Wal3432Natural Gas1.2 MW14.9 mi
Wal896Natural Gas1.2 MW16.1 mi
Wal1801Natural Gas1.2 MW16.2 mi
Century BESSBattery Storage10.0 MW17.0 mi

The largest power plant within 50 miles is Comanche Peak, a 2,430 MW nuclear plant 43 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Texas · Data centers in Ellis County · All Google data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.