Wal3432 is a natural gas power plant in Texas with a nameplate capacity of 1.2 MW. It generates roughly 218 MWh per year — enough to power about 20 average U.S. homes.
Its capacity factor of 2% reflects intermittent or peaking operation. At 2028 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, Wal3432 could make 10.5k MWh. In 2023 it made 218 MWh — the same as running at full power 2 hours in every 100.
Peaking or variableCapacity factor 2%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 951 W Belt Line Rd |
|---|---|
| City | Desoto |
| County | Dallas County |
| State | Texas |
| ZIP | 75115 |
| Coordinates | 32.59292, -96.87984 |
| Operator | Walmart Stores Texas, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | Natural Gas Internal Combustion Engine | Natural Gas | 0.4 MW | Operating | 2021 |
| GEN2 | Natural Gas Internal Combustion Engine | Natural Gas | 0.4 MW | Operating | 2021 |
| GEN3 | Natural Gas Internal Combustion Engine | Natural Gas | 0.4 MW | Operating | 2021 |
| CO₂ | 221 metric tons |
|---|---|
| NOₓ | 4 metric tons |
| CO₂ Rate | 2028 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Compass Data Center | 5.8 mi |
| Compass Data Center | 6.2 mi |
| Google data center, Red Oak | 6.3 mi |
| Data center, Lancaster under construction | 8.6 mi |
| DFW2-DC1 Project under construction | 10.7 mi |
| Google data center, Venus | 14.9 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map