8 data centers are mapped in Manassas (city), Virginia: 10 buildings covering about 47.1 acres (2,052,000 sq ft) of roof. Operators include Amazon Web Services, Digital Realty. The county is in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour.
Data centerUnder construction
| Data center | City | Roof area |
|---|---|---|
| Digital Realty IAD51 | Manassas | 9.3 ac |
| Digital Realty IAD50 | Manassas | 9.3 ac |
| Amazon Web Services data center, Manassas under construction | Manassas | 8.4 ac |
| Amazon IAD-100 | Manassas | 4.9 ac |
| Amazon IAD-102 | Manassas | 4.9 ac |
| Amazon IAD-101 | Manassas | 4.9 ac |
| Amazon IAD-103 | Manassas | 3.2 ac |
| Digital Realty IAD53 | Manassas | 2.2 ac |
Data centers in Manassas (city) draw from the regional grid. In 2023, electricity in EPA's Virginia/Carolinas region was 40% nuclear, 39% natural gas, 10% coal and 6% solar, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.