Digital Realty IAD51 is a data center in Manassas, Manassas (city), Virginia. It is mapped as 1 building covering about 9.3 acres (406,000 sq ft). Its power comes off the Virginia/Carolinas grid, which runs on 40% nuclear, 39% natural gas and 10% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 10051 Brickyard Way, Manassas VA 20108 |
|---|---|
| County | Manassas (city), Virginia |
| Coordinates | 38.73731, -77.50808 |
| On OpenStreetMap | way/1561771300 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.
Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
Mappers list this site's IT capacity as 81.0 MW. Running at that load all year, before any cooling, it would use about 709,560 MWh: as much electricity as roughly 66,000 U.S. homes (EIA's average is 10,791 kWh a year), and on this grid about 209,000 tons of CO₂.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Godwin Drive Plant | Oil | 6.3 MW | 0.2 mi |
| VMEA 1 Credit Gen | Oil | 13.2 MW | 0.2 mi |
| VMEA Peaking Gen | Oil | 6.4 MW | 0.2 mi |
| Dominion/Lo Mar | Oil | 19.2 MW | 0.8 mi |
| Gateway Gen | Oil | 3.6 MW | 0.8 mi |
| Church Street Plant | Oil | 4.3 MW | 2.6 mi |
| VA- US Foods- Manassas | Solar | 2.0 MW | 4.2 mi |
| Water Treatment Plant Generators | Oil | 1.8 MW | 6.3 mi |
| Energix Nokesville, LLC | Solar | 20.0 MW | 6.4 mi |
| Covanta Fairfax Energy | Biomass | 124 MW | 14.7 mi |
The largest power plant within 50 miles is North Anna, a 1,960 MW nuclear plant 49 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Digital Realty IAD50 | 9.3 ac | 0.0 mi |
| Amazon IAD-101 | 4.9 ac | 0.2 mi |
| Amazon IAD-100 | 4.9 ac | 0.2 mi |
| Amazon IAD-102 | 4.9 ac | 0.2 mi |
| Amazon IAD-103 | 3.2 ac | 0.2 mi |
| Digital Realty IAD53 | 2.2 ac | 0.3 mi |
| Amazon Web Services data center, Manassas | 4.9 ac | 0.8 mi |
| Amazon IAD-106 | 4.7 ac | 0.9 mi |
| Amazon IAD-105 | 4.9 ac | 0.9 mi |
| Amazon Web Services data center, Manassas under construction | 8.4 ac | 1.0 mi |
| Amazon IAD-104 | 4.9 ac | 1.0 mi |
| CloudHQ MCC2 | 8.0 ac | 1.1 mi |
| QTS Manassas DC2 | 2.9 ac | 1.1 mi |
| QTS Manassas DC1 | 2.8 ac | 1.1 mi |
| QTS Manassas DC3 | 3.1 ac | 1.1 mi |
And 42 more within 5 miles.
Data centers in Virginia · Data centers in Manassas (city) · All Digital Realty data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.