Power Plants in Citrus County, Florida

Citrus County, Florida has 2 power plants totaling 3,524 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants2operating sites
Capacity3,523 MWnameplate
Generation16.2M MWhannual
CO₂9.2Mmetric tons/year
Natural Gas 98%Solar 2%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
Crystal RiverCrystal RiverNatural Gas3,449 MWDuke Energy Florida, Llc
Bay Trail Solar Power PlantCrystal RiverSolar74.9 MWDuke Energy Florida, Llc

About power generation in Citrus County

Citrus County, Florida has 2 power plants totaling 3,524 MW of nameplate capacity. Natural Gas is the dominant fuel source at 98% of installed capacity, followed by Solar (2%). The largest facility is Crystal River at 3,449 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Citrus County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.