Citrus, Florida · Plant code 64145

Bay Trail Solar Power Plant

Bay Trail Solar Power Plant is a solar plant in Citrus, Florida. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 75 MW

Plant nameplate capacity.

Annual generation 145,002 MWh

Annual output from imported EIA and EPA records.

Capacity factor 21%

A simple way to compare utilization.

Operations

Operations details

Sector Electric Utility

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,022

Useful for technology-vintage context.

Location Crystal River, Florida

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 145,002 MWh · 100% of generation

Ownership

Who owns the plant.

Owner Duke Energy Florida, LLC

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
PV1 Solar Photovoltaic Solar 75 MW Operating 2,022

Generation trend

Monthly output pattern

7,820 MWh
Jan
10,230 MWh
Feb
9,849 MWh
Mar
16,332 MWh
Apr
17,484 MWh
May
16,111 MWh
Jun
14,151 MWh
Jul
13,593 MWh
Aug
9,774 MWh
Sep
11,749 MWh
Oct
10,201 MWh
Nov
7,708 MWh
Dec

Nearby plants

Closest comparison sites

Citrus, Florida

Crystal River

Natural Gas

Crystal River is a natural gas plant in Citrus, Florida. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3,448 MW 15,470,904 MWh 9,198,521 tons CO2
Duke Energy Florida, LLC + 3 more 2.8 mi away

Hernando, Florida

Hernando

Mlg

Hernando is a mlg plant in Hernando, Florida. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

2 MW 4,682 MWh 0 tons CO2
Hernando Energy 25.5 mi away
Solar

Hardeetown Solar Power Plant is a solar plant in Levy, Florida. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

75 MW 147,478 MWh 0 tons CO2
Duke Energy Florida, LLC 35.1 mi away

Marion, Florida

G2 Energy Marion LLC

Mlg

G2 Energy Marion LLC is a mlg plant in Marion, Florida. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 129 MWh 0 tons CO2
G2 Energy LLC 38.2 mi away

Related routes

Context around this plant