Tift County, Georgia has 3 power plants totaling 8 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Tift Fletcher | Tifton | Solar | 3.0 MW | Madison Energy Investments Llc |
| Tift Boyd | Tifton | Solar | 2.9 MW | Westbound Solar 3, Llc |
| Tift Bowen | Tifton | Solar | 1.9 MW | Madison Energy Investments Llc |
Tift County, Georgia has 3 power plants totaling 8 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity. The largest facility is Tift Fletcher at 3 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Tift County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.