Electric generating plantEIA plant no. 67246

Tift Bowen

Type
Solar Photovoltaic
Nameplate capacity
1.9 MW
Units
1
In service since
2023
Operator
Madison Energy Investments LLC
Location
Tifton, Tift County, Georgia
Rated 224th largest in Georgia · 12138th of 14,761 in the U.S. · by nameplate

Tift Bowen is a solar power plant in Georgia with a nameplate capacity of 1.9 MW. It generates roughly 926 MWh per year — enough to power about 88 average U.S. homes.

Its capacity factor of 6% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Tift Bowen could make 16.6k MWh. In 2023 it made 926 MWh — the same as running at full power 6 hours in every 100.

Nameplate, full year16.6k MWh1.9 MW × 8,760 hours
Actually generated926 MWhEPA eGRID, 2023 · ≈88 homes

Peaking or variableCapacity factor 6%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Location

Address3000 E B Hamilton Dr
CityTifton
CountyTift County
StateGeorgia
ZIP31793
Coordinates31.45756, -83.55885
OperatorMadison Energy Investments LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
TBPV1Solar PhotovoltaicSolar1.9 MWOperating2023

Grid context

NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Tift County

View all plants in Tift County →

Explore more