Power Plants Near 32347 — Perry, FL
25 power plants within 50 miles of ZIP 32347 (Perry, Florida). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 30.1668, -83.6160 · County: Taylor
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 4.7 mi | Perry Solar Facility Perry, FL | Solar | 5 MW | Duke Energy Florida, Llc |
| 20.3 mi | Sundance Renewable Energy Center Lee, FL | Solar | — | Duke Energy Florida, Llc |
| 20.6 mi | Winquepin Renewable Energy Center Lee, FL | Solar | 75 MW | Duke Energy Florida, Llc |
| 22.1 mi | Middle Lake Madison, FL | Solar | — | Florida Power & Light Co |
| 22.4 mi | Norton Creek Tbd, FL | Solar | 75 MW | Florida Power & Light Co |
| 25.3 mi | Bailey Mill Solar Monticello, FL | Solar | — | Duke Energy Florida, Llc |
| 29.7 mi | Suwannee River Live Oak, FL | Natural Gas | 198 MW | Duke Energy Florida, Llc |
| 30.0 mi | Falmouth Renewable Energy Center Live Oak, FL | Solar | 75 MW | Duke Energy Florida, Llc |
| 30.1 mi | Suwannee Solar Facility Live Oak, FL | Solar | 9 MW | Duke Energy Florida, Llc |
| 32.0 mi | Hamilton Solar Power Plant Jasper, FL | Solar | 75 MW | Duke Energy Florida, Llc |
| 34.9 mi | S O Purdom St Marks, FL | Natural Gas | 270 MW | City Of Tallahassee - (Fl) |
| 36.6 mi | Fl Solar 4, Llc Tallahassee, FL | Solar | 42 MW | Onward Energy |
| 40.9 mi | Pca-Valdosta Mill Valdosta, GA | Biomass | 70 MW | Pca-Valdosta Mill |
| 43.2 mi | Jennings Energy Storage Facility Jennings, FL | Other Fossil | 6 MW | Duke Energy Florida, Llc |
| 43.4 mi | Sub 12 Tallahassee, FL | Natural Gas | 19 MW | City Of Tallahassee - (Fl) |
| 43.8 mi | Twin Rivers Solar Power Plant Jasper, FL | Solar | 75 MW | Duke Energy Florida, Llc |
| 44.9 mi | Lowndes Tycor Farms Lake Park, GA | Solar | 2 MW | Safari Energy, Llc |
| 45.8 mi | Echo River Solar Live Oak, FL | Solar | 105 MW | Florida Power & Light Co |
| 46.4 mi | Cotal Solar Farm Tallahassee, FL | Solar | 20 MW | Onward Energy |
| 47.2 mi | Quitman Solar Quitman, GA | Solar | 150 MW | Quitman Solar, Llc |
| 47.3 mi | Pecan Row Landfill To Electric Facility Valdosta, GA | Biomass | 6 MW | Energy Developments, Inc D/B/A Edl |
| 48.1 mi | Quitman Ii Solar Quitman, GA | Solar | 150 MW | Quitman Ii Solar, Llc |
| 49.0 mi | Swift Creek Chemical Complex White Springs, FL | Other Fossil | 19 MW | White Springs Agrici Chem Inc |
| 49.4 mi | Lowndes Cowart Valdosta, GA | Solar | 3 MW | Madison Energy Investments Llc |
| 49.4 mi | Hildreth Solar Power Plant O'brien, FL | Solar | 75 MW | Duke Energy Florida, Llc |
Power generation near this area
There are 25 power plants within 50 miles of Perry, Florida (ZIP 32347), with a combined 1,522 MW of nameplate capacity. Solar is the most common fuel type in this area with 18 of the 25 nearby plants. The closest plant is Perry Solar Facility at 4.7 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Florida, visit the Florida state page.
← Search a different location · Printable proximity report →