Power Plants Near 37771 — Lenoir City, TN
24 power plants within 50 miles of ZIP 37771 (Lenoir City, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.8104, -84.2665 · County: Loudon
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 1.8 mi | Fort Loudoun Lenoir City, TN | Hydroelectric | 153 MW | Tennessee Valley Authority |
| 5.5 mi | Melton Hill Lenoir City, TN | Hydroelectric | 72 MW | Tennessee Valley Authority |
| 6.0 mi | Primient Loudon Plant Loudon, TN | Natural Gas | 61 MW | Primient, LLC |
| 15.2 mi | SR Blount, LLC Maryville, TN | Solar | 2 MW | SR Blount, LLC |
| 15.4 mi | Kingston Kingston, TN | Coal | 1,700 MW | Tennessee Valley Authority |
| 16.2 mi | SR Maryville Maryville, TN | Solar | 1 MW | SR Maryville, LLC |
| 19.9 mi | SR Maryville East Maryville, TN | Solar | 8 MW | SR Maryville East, LLC |
| 21.3 mi | University of Tennessee Steam Plant Knoxville, TN | Natural Gas | 5 MW | University of Tennessee |
| 22.0 mi | Chilhowee Tallassee, TN | Hydroelectric | 50 MW | Brookfield Smoky Mountain Hydropower LP |
| 24.9 mi | Chestnut Ridge Gas Recovery Heiskell, TN | Natural Gas | 5 MW | WM Renewable Energy LLC |
| 27.2 mi | Calderwood Tallassee, TN | Hydroelectric | 157 MW | Brookfield Smoky Mountain Hydropower LP |
| 30.2 mi | Norris Dam Norris, TN | Hydroelectric | 131 MW | Tennessee Valley Authority |
| 31.0 mi | DMAT Denso - SEAT Solar Holdings, LLC Athens, TN | Solar | 5 MW | Solarity Aggregator, LLC |
| 31.1 mi | Cheoah Tapoco, NC | Hydroelectric | 140 MW | Brookfield Smoky Mountain Hydropower LP |
| 32.0 mi | Watts Bar Hydro Spring City, TN | Hydroelectric | 175 MW | Tennessee Valley Authority |
| 32.7 mi | Watts Bar Nuclear Plant Spring City, TN | Nuclear | 2,540 MW | Tennessee Valley Authority |
| 33.8 mi | Santeetlah Robbinsville, NC | Hydroelectric | 45 MW | Brookfield Smoky Mountain Hydropower LP |
| 35.9 mi | Fontana Dam Fontana Dam, NC | Hydroelectric | 255 MW | Tennessee Valley Authority |
| 42.0 mi | Douglas Dam Dandridge, TN | Hydroelectric | 151 MW | Tennessee Valley Authority |
| 44.4 mi | Apalachia Reliance, TN | Hydroelectric | 94 MW | Tennessee Valley Authority |
| 45.8 mi | Hiwassee Dam Murphy, NC | Hydroelectric | 166 MW | Tennessee Valley Authority |
| 49.6 mi | Cherokee Dam Rudledge, TN | Hydroelectric | 135 MW | Tennessee Valley Authority |
| 49.9 mi | Nantahala Topton, NC | Hydroelectric | 43 MW | Duke Energy Carolinas, LLC |
| 49.9 mi | Queens Creek Topton, NC | Hydroelectric | 1 MW | Duke Energy Carolinas, LLC |
Power generation near this area
There are 24 power plants within 50 miles of Lenoir City, Tennessee (ZIP 37771), with a combined 6,094 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 15 of the 24 nearby plants. The closest plant is Fort Loudoun at 1.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.
← Search a different location · Printable proximity report →