Power Plants Near 37885 — Vonore, TN
38 power plants within 50 miles of ZIP 37885 (Vonore, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.5354, -84.1778 · County: Monroe
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 7.2 mi | Chilhowee Tallassee, TN | Hydroelectric | 50 MW | Brookfield Smoky Mountain Hydropower Lp |
| 7.8 mi | Vonore Battery Energy Storage System Vonore, TN | Battery Storage | — | Tennessee Valley Authority |
| 11.5 mi | Calderwood Tallassee, TN | Hydroelectric | 157 MW | Brookfield Smoky Mountain Hydropower Lp |
| 13.8 mi | Sr Maryville Maryville, TN | Solar | — | Sr Maryville, Llc |
| 14.8 mi | Cheoah Tapoco, NC | Hydroelectric | 140 MW | Brookfield Smoky Mountain Hydropower Lp |
| 15.9 mi | Primient Loudon Plant Loudon, TN | Natural Gas | 61 MW | Primient, Llc |
| 18.1 mi | Fort Loudoun Lenoir City, TN | Hydroelectric | 153 MW | Tennessee Valley Authority |
| 18.4 mi | Sr Blount, Llc Maryville, TN | Solar | — | Sr Blount, Llc |
| 18.7 mi | Santeetlah Robbinsville, NC | Hydroelectric | 45 MW | Brookfield Smoky Mountain Hydropower Lp |
| 21.8 mi | Fontana Dam Fontana Dam, NC | Hydroelectric | 255 MW | Tennessee Valley Authority |
| 22.2 mi | Sr Maryville East Maryville, TN | Solar | — | Sr Maryville East, Llc |
| 25.1 mi | Melton Hill Lenoir City, TN | Hydroelectric | 72 MW | Tennessee Valley Authority |
| 26.3 mi | Apalachia Reliance, TN | Hydroelectric | 94 MW | Tennessee Valley Authority |
| 26.6 mi | Hiwassee Dam Murphy, NC | Hydroelectric | 166 MW | Tennessee Valley Authority |
| 31.6 mi | Kingston Kingston, TN | Coal | 1,700 MW | Tennessee Valley Authority |
| 31.9 mi | University Of Tennessee Steam Plant Knoxville, TN | Natural Gas | 5 MW | University Of Tennessee |
| 33.6 mi | Bull Run Clinton, TN | Coal | 950 MW | Tennessee Valley Authority |
| 33.6 mi | Nantahala Topton, NC | Hydroelectric | 43 MW | Duke Energy Carolinas, Llc |
| 33.6 mi | Queens Creek Topton, NC | Hydroelectric | 1 MW | Duke Energy Carolinas, Llc |
| 34.3 mi | Watts Bar Fossil Spring City, TN | Coal | — | Tennessee Valley Authority |
| 34.6 mi | Watts Bar Hydro Spring City, TN | Hydroelectric | 175 MW | Tennessee Valley Authority |
| 34.7 mi | Watts Bar Nuclear Plant Spring City, TN | Nuclear | 2,540 MW | Tennessee Valley Authority |
| 35.5 mi | Mission Murphy, NC | Hydroelectric | 2 MW | Northbrook Carolina Hydro Ii, Llc |
| 35.9 mi | Ocoee 2 Benton, TN | Hydroelectric | 23 MW | Tennessee Valley Authority |
| 36.2 mi | Ocoee 3 Benton, TN | Hydroelectric | 29 MW | Tennessee Valley Authority |
| 36.6 mi | Bowater Newsprint Calhoun Operation Calhoun, TN | Biomass | 63 MW | Resolute Forest Products |
| 36.7 mi | Martins Creek Solar Nc, Llc Murphy, NC | Solar | 1 MW | Duke Energy Renewables Services |
| 37.1 mi | Murphy Farm Power, Llc Culberson, NC | Solar | 1 MW | Duke Energy Renewables Services |
| 37.7 mi | Cs Murphy Point, Llc Murphy, NC | Solar | 1 MW | Duke Energy Renewables Services |
| 40.1 mi | Nottely Blairsville, GA | Hydroelectric | 16 MW | Tennessee Valley Authority |
| 40.4 mi | Ocoee 1 Benton, TN | Hydroelectric | 19 MW | Tennessee Valley Authority |
| 41.0 mi | Chestnut Ridge Gas Recovery Heiskell, TN | Natural Gas | 5 MW | Wm Renewable Energy Llc |
| 41.5 mi | Buffalo Mountain Oliver Springs, TN | Wind | 2 MW | Tennessee Valley Authority |
| 41.8 mi | Chatuge Hayesville, NC | Hydroelectric | 13 MW | Tennessee Valley Authority |
| 41.9 mi | Buffalo Mountain Energy Center Oliver Springs, TN | Wind | 27 MW | Invenergy Services Llc |
| 45.4 mi | Blue Ridge Blue Ridge, GA | Hydroelectric | 24 MW | Tennessee Valley Authority |
| 46.4 mi | Douglas Dam Dandridge, TN | Hydroelectric | 151 MW | Tennessee Valley Authority |
| 47.8 mi | Norris Dam Norris, TN | Hydroelectric | 131 MW | Tennessee Valley Authority |
Power generation near this area
There are 38 power plants within 50 miles of Vonore, Tennessee (ZIP 37885), with a combined 7,113 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 21 of the 38 nearby plants. The closest plant is Chilhowee at 7.2 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.
← Search a different location · Printable proximity report →