Power Plants Near 38233 — Kenton, TN

22 power plants within 50 miles of ZIP 38233 (Kenton, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 36.1906, -89.0229 · County: Gibson

Natural Gas 61%Coal 30%Solar 9%
DistancePlantFuelCapacityOperator
13.6 miOetn1
Obion, TN
Solar100 MWOe_tn1
17.7 miSr Trenton
Trenton, TN
SolarSr Trenton, Llc
22.4 miSr Milan
Milan, TN
SolarSr Milan, Llc
23.2 miGleason Generating Facility
Gleason, TN
Natural Gas568 MWTennessee Valley Authority
25.7 miRidgely Energy Farm
Ridgely, TN
SolarLeeward Asset Management, Llc
26.0 miSr Trezevant
Trezevant, TN
SolarSr Trezevant, Llc
27.7 miSr South Gibson
Medina, TN
SolarSr South Gibson, Llc
37.4 miNew Madrid
New Madrid, MO
Coal1,300 MWAssociated Electric Coop, Inc
40.7 miSr Jackson Ii
Jackson, TN
Solar1 MWSr Jackson Ii, Llc
42.3 miProvidence Solar
Madison, TN
Solar16 MWProvidence Solar Center, Llc
42.3 miLagoon Creek
Brownsville, TN
Natural Gas1,625 MWTennessee Valley Authority
42.5 miSr Paris
Paris, TN
Solar7 MWSr Paris, Llc
42.9 miSr Mckellar
Denmark, TN
Solar70 MWSr Mckellar, Llc
43.0 miSr Forked Deer
Ripley, TN
SolarSr Forked Deer, Llc
43.1 miSr Brownsville
Brownsville, TN
SolarSr Brownsville, Llc
43.6 miSr Denmark
Denmark, TN
SolarSr Denmark, Llc
44.0 miSr Puryear
Puryear, TN
SolarSr Puryear, Llc
44.9 miHaywood Solar
Brownsville, TN
Solar3 MWHaywood Solar, Smllc
45.8 miBrownsville Peaking Power
Brownsville, TN
Natural Gas460 MWTennessee Valley Authority
46.1 miSr Durhamville
Durhamville, TN
SolarSr Durhamville, Llc
46.6 miCrooked Lake Solar, Llc
Blytheville, AR
Solar175 MWCrooked Lake Solar, Llc
48.9 miSr Lexington
Lexington, TN
SolarSr Lexington, Llc

Power generation near this area

There are 22 power plants within 50 miles of Kenton, Tennessee (ZIP 38233), with a combined 4,325 MW of nameplate capacity. Solar is the most common fuel type in this area with 18 of the 22 nearby plants. The closest plant is Oetn1 at 13.6 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.

← Search a different location · Printable proximity report →