Power Plants Near 38328 — Darden, TN

21 power plants within 50 miles of ZIP 38328 (Darden, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 35.6630, -88.2177 · County: Henderson

Natural Gas 81%Hydroelectric 10%Solar 6%Biomass 3%
DistancePlantFuelCapacityOperator
9.4 miSr Lexington
Lexington, TN
SolarSr Lexington, Llc
15.4 miSr Benton
Holladay, TN
SolarSr Benton, Llc
23.9 miSr Clifton
Clifton, TN
SolarSr Clifton, Llc
27.6 miWest Camden
Camden, TN
Biomass5 MWWm Renewable Energy Llc
28.3 miJohnsonville
New Johnsonville, TN
Natural Gas1,426 MWTennessee Valley Authority
29.4 miSr Adamsville
Mcnairy, TN
SolarSr Adamsville, Llc
32.5 miSr Trezevant
Trezevant, TN
SolarSr Trezevant, Llc
35.5 miSr South Gibson
Medina, TN
SolarSr South Gibson, Llc
36.1 miSr Milan
Milan, TN
SolarSr Milan, Llc
39.5 miSr Jackson Ii
Jackson, TN
Solar1 MWSr Jackson Ii, Llc
40.2 miSelmer Farm Llc
Selmer, TN
Solar16 MWOnward Energy
40.3 miSr Mckellar
Denmark, TN
Solar70 MWSr Mckellar, Llc
40.7 miSelmer I
Selmer, TN
Solar16 MWSelmer North Solar I, Llc
40.7 miSr Denmark
Denmark, TN
SolarSr Denmark, Llc
41.1 miPickwick Landing Dam
Pickwick Dam, TN
Hydroelectric240 MWTennessee Valley Authority
42.0 miSelmer Ii
Selmer, TN
Solar8 MWSelmer North Solar Ii, Llc
42.2 miMulberry Farm Llc
Selmer, TN
Solar16 MWOnward Energy
42.6 miPackaging Corp Of America
Counce, TN
Biomass73 MWPackaging Corp Of America
45.3 miSr Trenton
Trenton, TN
SolarSr Trenton, Llc
45.9 miGleason Generating Facility
Gleason, TN
Natural Gas568 MWTennessee Valley Authority
47.0 miProvidence Solar
Madison, TN
Solar16 MWProvidence Solar Center, Llc

Power generation near this area

There are 21 power plants within 50 miles of Darden, Tennessee (ZIP 38328), with a combined 2,454 MW of nameplate capacity. Solar is the most common fuel type in this area with 16 of the 21 nearby plants. The closest plant is Sr Lexington at 9.4 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.

← Search a different location · Printable proximity report →