Power Plants Near 38357 — Michie, TN

22 power plants within 50 miles of ZIP 38357 (Michie, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 35.0603, -88.4405 · County: Mcnairy

Natural Gas 60%Hydroelectric 25%Solar 13%Biomass 2%
DistancePlantFuelCapacityOperator
8.4 miSelmer I
Selmer, TN
Solar16 MWSelmer North Solar I, Llc
9.0 miSelmer Farm Llc
Selmer, TN
Solar16 MWOnward Energy
9.6 miMulberry Farm Llc
Selmer, TN
Solar16 MWOnward Energy
9.9 miPackaging Corp Of America
Counce, TN
Biomass73 MWPackaging Corp Of America
10.8 miPickwick Landing Dam
Pickwick Dam, TN
Hydroelectric240 MWTennessee Valley Authority
13.8 miSelmer Ii
Selmer, TN
Solar8 MWSelmer North Solar Ii, Llc
14.1 miSr Adamsville
Mcnairy, TN
SolarSr Adamsville, Llc
26.0 miSr Middleton
Middleton, TN
SolarSr Middleton, Llc
34.9 miSr Clifton
Clifton, TN
SolarSr Clifton, Llc
35.4 miSr Bolivar
Bolivar, TN
Solar3 MWSr Bolivar, Llc
36.4 miMuscle Shoals
Cherokee, AL
Solar227 MWMuscle Shoals Solar, Llc
37.4 miRiver Bend Solar, Llc (Al)
Florence, AL
Solar75 MWRiver Bend Solar, Llc
40.0 miColbert
Tuscumbia, AL
Natural Gas1,170 MWTennessee Valley Authority
44.4 miLatitude Solar Center
Whiteville, TN
Solar15 MWArevon Energy, Inc.
44.5 miSr Denmark
Denmark, TN
SolarSr Denmark, Llc
44.9 miSr Mckellar
Denmark, TN
Solar70 MWSr Mckellar, Llc
45.8 miSr Lexington
Lexington, TN
SolarSr Lexington, Llc
45.9 miMagnolia Power Plant
Ashland, MS
Natural Gas1,004 MWTennessee Valley Authority
46.4 miSr Jackson Ii
Jackson, TN
Solar1 MWSr Jackson Ii, Llc
47.7 miYum Yum Solar Llc
Yum Yum, TN
SolarInvenergy Services Llc
49.5 miProvidence Solar
Madison, TN
Solar16 MWProvidence Solar Center, Llc
49.6 miWilson Dam
Muscle Shoals, AL
Hydroelectric667 MWTennessee Valley Authority

Power generation near this area

There are 22 power plants within 50 miles of Michie, Tennessee (ZIP 38357), with a combined 3,615 MW of nameplate capacity. Solar is the most common fuel type in this area with 17 of the 22 nearby plants. The closest plant is Selmer I at 8.4 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.

← Search a different location · Printable proximity report →