Power Plants Near 38457 — Five Points, TN

16 power plants within 50 miles of ZIP 38457 (Five Points, Tennessee). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 35.0310, -87.2961 · County: Lawrence

Nuclear 47%Natural Gas 36%Hydroelectric 13%Solar 4%
DistancePlantFuelCapacityOperator
16.2 miWheeler Dam
Town Creek, AL
Hydroelectric404 MWTennessee Valley Authority
24.6 miWilson Dam
Muscle Shoals, AL
Hydroelectric667 MWTennessee Valley Authority
24.7 miBrowns Ferry
Decatur, AL
Nuclear3,854 MWTennessee Valley Authority
24.9 miCumblerland Land Holdings, Llc
Elkmont, AL
Solar15 MWCumberland Land Holdings, Llc
25.2 miHillsboro Solar 3
Wheeler, AL
SolarUrban Grid Solar
27.2 miLawrence County Solar
Wheeler, AL
SolarTennessee Valley Authority
30.1 miMorgan Energy Center
Decatur, AL
Natural Gas900 MWMorgan Energy Center Llc
30.2 miDecatur-Morgan Co Lfg Recovery Project
Trinity, AL
Biomass2 MWEnergy Developments, Inc D/B/A Edl
31.8 miDecatur Energy Center
Decatur, AL
Natural Gas902 MWDecatur Energy Center Llc
32.2 miSpring Valley Solar 2
Littleville, AL
SolarUrban Grid Solar
33.9 miRiver Bend Solar, Llc (Al)
Florence, AL
Solar75 MWRiver Bend Solar, Llc
37.1 miColbert
Tuscumbia, AL
Natural Gas1,170 MWTennessee Valley Authority
38.9 miMuscle Shoals
Cherokee, AL
Solar227 MWMuscle Shoals Solar, Llc
40.2 miTai Huntsville Solar Hybrid
Huntsville, AL
Solar32 MWTai Huntsville Solar, Llc
45.0 miSr Clifton
Clifton, TN
SolarSr Clifton, Llc
48.5 miRedstone Arsenal Hybrid
Huntsville, AL
Solar11 MWMn8 Energy Llc

Power generation near this area

There are 16 power plants within 50 miles of Five Points, Tennessee (ZIP 38457), with a combined 8,258 MW of nameplate capacity. Solar is the most common fuel type in this area with 9 of the 16 nearby plants. The closest plant is Wheeler Dam at 16.2 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Tennessee, visit the Tennessee state page.

← Search a different location · Printable proximity report →