13.4 miMarion County Solar Project
Marion, OH
SolarMarion County Solar Project, Llc
14.1 miWhirlpool Corporation - Marion Wind Farm
Marion, OH
Wind5 MWOee Xxiii Llc
14.1 miProspect Municipal
Prospect, OH
Oil2 MWAmerican Mun Power-Ohio, Inc
14.2 miPoet Biorefining - Marion, Llc
Marion, OH
Natural Gas8 MWPoet Biorefining - Marion, Llc
16.4 miGalion Generating Station
Galion, OH
Natural Gas50 MWAmerican Mun Power-Ohio, Inc
17.1 miGalion
Galion, OH
Oil5 MWAmerican Mun Power-Ohio, Inc
21.3 miHarpster Wind
Harpster, OH
Wind2 MWOee Xvii, Llc
23.4 miRichwood Solar And Storage
Tbd, OH
SolarSamsung C&t Renewables, Llc
25.7 miBlack Fork Wind Energy Project
Crestline, OH
WindCapital Power Corporation
26.4 miO'shaughnessy Hydro
Dublin, OH
Hydroelectric5 MWCity Of Columbus - (Oh)
26.7 miBroshco Fabricated Products
Mansfield, OH
Natural Gas5 MWBroshco Fabricated Products
27.9 miCadence Solar Energy Center
Marysville, OH
SolarCadence Solar Energy Llc
28.1 miProgress Drive Generation Station
Shelby, OH
Oil4 MWCity Of Shelby - (Oh)
29.3 miAeug Union Solar, Llc
West Mansfield, OH
Solar325 MWAcciona Energy Usa Global, Llc
29.6 miShelby Municipal Light Plant
Shelby, OH
CoalCity Of Shelby - (Oh)
30.2 miShelby Solar Array
Shelby, OH
Solar2 MWAep Onsite Partners, Llc
30.2 miFlint
New Albany, OH
Battery StorageFlint
30.4 miCity Of Shelby Electric Distribution
Shelby, OH
OilCity Of Shelby - (Oh)
30.5 miShelby North
Shelby, OH
Oil2 MWAmerican Mun Power-Ohio, Inc
31.4 miShelby South
Shelby, OH
Oil2 MWCity Of Shelby - (Oh)
32.7 miWyandot Solar Farm
Upper Sandusky, OH
Solar10 MWWyandot Solar Llc
32.7 miSycamore
Sycamore, OH
Solar1 MWMadison Energy Investments Llc
37.1 miDenison Solar Array
Granville, OH
Solar2 MWAep Onsite Partners, Llc
38.2 miPs St-8 Engine No 1
Columbus, OH
Oil2 MWCity Of Columbus - (Oh)
38.3 mi3100 Valleyview Drive
Columbus, OH
Solar1 MWMadison Energy Investments Llc
38.5 miDodge Park Engine No 1
Columbus, OH
Oil2 MWCity Of Columbus - (Oh)
38.7 miSt-1/1a Engine No 1
Columbus, OH
Oil1 MWCity Of Columbus - (Oh)
39.3 miUnion Ridge Solar
Harrison Township, OH
SolarBig Sky Wind, Llc
39.9 miMadison Fields Solar Project, Llc
Irwin, OH
Solar180 MWMadison Fields Solar Project, Llc
40.1 miRenick Run Pumping Station 03-04
Columbus, OH
Oil3 MWCity Of Columbus - (Oh)
41.4 miJackson Pike Wwtp Cogen Engines
Columbus, OH
BiomassCity Of Columbus - (Oh)
42.0 miRefuse & Coal
Columbus, OH
BiomassCity Of Columbus - (Oh)
42.3 miScioto Ridge Wind Farm
Belle Center, OH
Wind250 MWBig Sky Wind, Llc
43.7 miBuckeye Wind Farm
Mechanicsburgh, OH
WindBig Sky Wind, Llc
43.9 miIgs Cmh4, Llc
Madison, OH
Solar4 MWGreenbacker Renewable Energy Corporation
45.9 miHardin Solar Energy Ii Llc
Belle Center, OH
Solar150 MWInvenergy Services Llc
46.0 miEnergy Developments, Hancock
Findlay, OH
Biomass3 MWEnergy Developments, Inc D/B/A Edl
46.1 miHog Creek Wind Project
Ada, OH
Wind66 MWHog Creek Wind Project Llc
46.7 miHardin Solar Iii
Alger, OH
SolarHardin Solar Energy Iii
46.9 miRipley Solar
Millersport, OH
SolarCypress Creek Renewables
47.4 miHardin Solar Energy Llc
Alger, OH
Solar150 MWDominion Renewable Energy
49.3 miFirelands Wind
Monroeville, OH
WindFirelands Wind, Llc
49.6 miBig Plain Solar, Llc
London, OH
Solar196 MWLeeward Asset Management, Llc
49.7 miSpringwater Solar, Llc
London, OH
SolarSpringwater Solar, Llc

Power generation near this area

There are 44 power plants within 50 miles of Cardington, Ohio (ZIP 43315), with a combined 1,436 MW of nameplate capacity. Solar is the most common fuel type in this area with 18 of the 44 nearby plants. The closest plant is Marion County Solar Project at 13.4 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Ohio, visit the Ohio state page.

← Search a different location · Printable proximity report →