Power Plants Near 73530 — Davidson, OK
31 power plants within 50 miles of ZIP 73530 (Davidson, Oklahoma). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 34.2514, -99.0640 · County: Tillman
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 10.7 mi | Electra Wind Farm Oklaunion, TX | Wind | 230 MW | Electra Wind, Llc |
| 16.5 mi | Vernon Solar And Storage Vernon, TX | Solar | — | Vernon Solar And Storage, Llc |
| 16.9 mi | Lockett Windfarm Vernon, TX | Wind | 184 MW | Lockett Windfarm, Llc |
| 17.6 mi | Blue Summit Ii Storage Vernon, TX | Battery Storage | — | Blue Summit Ii Storage, Llc |
| 17.6 mi | Blue Summit Wind Llc Vernon, TX | Wind | 135 MW | Blue Summit Wind Llc |
| 19.4 mi | Blue Summit Storage, Llc Vernon, TX | Other Fossil | 30 MW | Blue Summit Storage, Llc |
| 19.4 mi | Hutcherson Solar Vernon, TX | Solar | — | Greenalia Solar Power Hutcherson, Llc |
| 22.1 mi | Short Creek Solar Electra, TX | Solar | — | Wichita Solar I, Llc |
| 23.7 mi | Blue Summit Ii Wind Vernon, TX | Wind | 99 MW | Blue Summit Ii Wind, Llc |
| 25.7 mi | North Fork Solar Project Snyder, OK | Solar | 120 MW | North Fork Solar Project, Llc |
| 27.6 mi | Western Trail Wind, Llc Electra, TX | Wind | 367 MW | Orsted Onshore North America |
| 29.1 mi | Blue Summit Iii Wind Chilicothe, TX | Wind | 200 MW | Blue Summit Iii Wind, Llc |
| 29.5 mi | Kiowa County Solar Project, Llc Snyder, OK | Solar | — | Kiowa County Solar Project, Llc |
| 33.8 mi | Works 4 Wichita Falls, TX | Oil | 5 MW | Vitro Architectural Glass |
| 36.8 mi | Diversion Wind Energy Llc Seymour, TX | Wind | 201 MW | Southwestern Electric Power Co |
| 38.2 mi | Signal Hill Generating Llc Wichita Falls, TX | Natural Gas | 80 MW | Signal Hill Generating Llc |
| 42.3 mi | Wal414 Wichita Falls, TX | Natural Gas | 1 MW | Walmart Stores Texas, Llc |
| 44.3 mi | Montgomery Ranch Wind Farm, Llc Crowell, TX | Wind | — | Montgomery Ranch Wind Farm, Llc |
| 45.1 mi | Foard City Wind Crowell, TX | Wind | 353 MW | Foard City Wind, Llc |
| 46.2 mi | Lazy U Ess 1 Tbd, TX | Battery Storage | — | Lazy U Ess 1 Llc |
| 46.2 mi | Lazy U Ess 2 Tbd, TX | Battery Storage | — | Lazy U Ess 2 Llc |
| 46.2 mi | Lazy U Solar 1 Tbd, TX | Solar | — | Lazy U Solar 1 Llc |
| 46.2 mi | Lazy U Solar 2 Tbd, TX | Solar | — | Lazy U Solar 2 Llc |
| 46.7 mi | Comanche (Ok) Lawton, OK | Natural Gas | 294 MW | Public Service Co Of Oklahoma |
| 47.1 mi | Seymour Hills Wind Project, Llc Seymour, TX | Wind | 30 MW | Engie North America |
| 47.4 mi | Green Pastures Wind I Seymour, TX | Wind | 150 MW | Green Pastures Wind I, Llc |
| 48.1 mi | Ft. Sill Energy Center Lawton, OK | Natural Gas | — | Public Service Co Of Oklahoma |
| 49.0 mi | Tg East Truscott, TX | Wind | 336 MW | Tg East Wind Project Llc |
| 49.7 mi | Green Pastures Wind Ii Seymour, TX | Wind | 150 MW | Green Pastures Wind Ii, Llc |
| 49.8 mi | Blue Canyon Windpower Carnegie, OK | Wind | 74 MW | Blue Canyon Windpower Llc |
| 49.8 mi | Blue Canyon Windpower Ii Carnegie, OK | Wind | 151 MW | Blue Canyon Windpower Ii Llc |
Power generation near this area
There are 31 power plants within 50 miles of Davidson, Oklahoma (ZIP 73530), with a combined 3,191 MW of nameplate capacity. Wind is the most common fuel type in this area with 15 of the 31 nearby plants. The closest plant is Electra Wind Farm at 10.7 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oklahoma, visit the Oklahoma state page.
← Search a different location · Printable proximity report →