Power Plants Near 76802 — Early, TX
26 power plants within 50 miles of ZIP 76802 (Early, Texas). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 31.7874, -98.9229 · County: Brown
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 6.8 mi | Zephyr Storage Early, TX | Battery Storage | — | Ric Development, Llc |
| 13.9 mi | Logans Gap Wind Llc Comanche, TX | Wind | 200 MW | Pattern Operators Lp |
| 16.2 mi | Chisme Solar And Storage Tbd, TX | Solar | — | Red River Clean Energy |
| 20.1 mi | Flat Top Wind I Mullin, TX | Wind | 200 MW | Bhe Renewables, Llc |
| 22.7 mi | Ip Radian, Llc Brookesmith, TX | Solar | 320 MW | Ip Radian, Llc |
| 30.1 mi | Priddy Wind Project Goldthwaite, TX | Wind | 302 MW | Engie North America |
| 30.9 mi | Darkwood Solar Proctor, TX | Solar | — | Mustang Creek Solar I, Llc |
| 35.4 mi | Hanson Valera, TX | Solar | — | Cypress Creek Renewables |
| 38.7 mi | Ranchland Wind Project Ii Cisco, TX | Wind | 148 MW | Ranchland Wind Project Ii, Llc |
| 38.7 mi | Ranchland Wind Storage Cisco, TX | Other Fossil | 72 MW | Ranchland Wind Storage, Llc |
| 38.7 mi | Ranchland Wind Project I Cisco, TX | Wind | 115 MW | Ranchland Wind Project I, Llc |
| 38.7 mi | Goldthwaite Wind Energy Facility Goldthwaite, TX | Wind | 150 MW | Invenergy Services Llc |
| 40.9 mi | Bmp Wind (Tx) Baird, TX | Wind | 293 MW | Bmp Wind Llc |
| 41.8 mi | Grizzly Ridge Solar Hamilton County, TX | Solar | 100 MW | Grizzly Ridge Solar Llc |
| 41.9 mi | Cisco Bess Cisco, TX | Battery Storage | 10 MW | Hen Infrastructure, L.l.c. |
| 42.9 mi | Castle Gap Wind Goldthwaite, TX | Wind | 197 MW | Castle Gap Wind Power, Llc |
| 44.6 mi | Roadrunner Crossing Energy Storage Llc Cisco, TX | Battery Storage | — | Roadrunner Crossing Energy Storage Llc |
| 45.2 mi | Cardinal Solar (Tx) San Saba, TX | Solar | — | Gransolar Bess Texas Six Llc |
| 46.2 mi | Silver Star I Wind Power Project Dublin, TX | Wind | 53 MW | Silver Star I Power Partners Llc |
| 46.2 mi | Roadrunner Wind Farm Cisco, TX | Wind | 256 MW | Roadrunner Crossing Wind Farm, Llc |
| 46.4 mi | Century Oak Wind Project, Llc Cisco, TX | Wind | 152 MW | Century Oak Wind Project, Llc |
| 46.4 mi | Longhorn Storage Cisco, TX | Battery Storage | 165 MW | Longhorn Storage Llc |
| 47.0 mi | Sequoia 1 Cisco, TX | Solar | — | Sequoia 1 Solar Project |
| 47.3 mi | Rattlesnake Power, Llc Brady, TX | Wind | 160 MW | Rattlesnake Power, Llc |
| 47.8 mi | Heart Of Texas Wind Project Brady, TX | Wind | 180 MW | Scout Clean Energy Llc |
| 48.4 mi | Erath County Solar Stephenville, TX | Solar | — | Erath County Solar Llc |
Power generation near this area
There are 26 power plants within 50 miles of Early, Texas (ZIP 76802), with a combined 3,072 MW of nameplate capacity. Wind is the most common fuel type in this area with 13 of the 26 nearby plants. The closest plant is Zephyr Storage at 6.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Texas, visit the Texas state page.
← Search a different location · Printable proximity report →