Power Plants Near 81135 — Homelake, CO
14 power plants within 50 miles of ZIP 81135 (Homelake, Colorado). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.5756, -106.0970 · County: Rio Grande
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 0.3 mi | Monte Vista Solar 2 Csg, Llc Monte Vista, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 7.9 mi | Alamosa Solar Mosca, CO | Solar | 30 MW | Solar Of Alamosa Llc |
| 9.9 mi | Hooper Solar Mosca, CO | Solar | 52 MW | Solar Star Colorado Iii, Llc |
| 12.4 mi | San Luis Valley Solar Ranch Mosca, CO | Solar | 35 MW | Avangrid Power Llc |
| 13.6 mi | Greater Sandhill I Mosca, CO | Solar | 19 MW | Greater Sandhill I Llc |
| 13.7 mi | Alamosa Alamosa, CO | Oil | 53 MW | Public Service Co Of Colorado |
| 14.3 mi | Sune Alamosa Hooper, CO | Solar | 8 MW | Sune Alamosa1 Llc |
| 14.7 mi | Oak Leaf Solar Xxx Llc (Csg) Alamosa, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 15.5 mi | San Luis Valley Solar Array Center, CO | Solar | 3 MW | Aep Onsite Partners, Llc |
| 15.6 mi | Alamosa Solar South Csg Alamosa, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 16.1 mi | Rock Creek 2 Csg Alamosa, CO | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 27.0 mi | Conejos 1 Community Solar Array La Jara, CO | Solar | 2 MW | Mn8 Energy Llc |
| 35.3 mi | San Luis Solar Garden Antonito, CO | Solar | 1 MW | Aes Distributed Energy |
| 46.5 mi | Blue Sky One Taos, NM | Solar | 1 MW | Ssa Solar Of Nm, Llc |
Power generation near this area
There are 14 power plants within 50 miles of Homelake, Colorado (ZIP 81135), with a combined 210 MW of nameplate capacity. Solar is the most common fuel type in this area with 13 of the 14 nearby plants. The closest plant is Monte Vista Solar 2 Csg, Llc at 0.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Colorado, visit the Colorado state page.
← Search a different location · Printable proximity report →