Power Plants Near 84719 — Brian Head, UT
37 power plants within 50 miles of ZIP 84719 (Brian Head, Utah). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.6985, -112.8437 · County: Iron
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 12.5 mi | Parowan Solar Parowan, UT | Battery Storage | — | Leeward Asset Management, Llc |
| 13.2 mi | Utah Red Hills Renewable Energy Park Parowan, UT | Solar | 80 MW | Mn8 Energy Llc |
| 15.4 mi | Cedar Valley Solar Plant Cedar City, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 16.9 mi | Iron Springs Bess Cedar City, UT | Battery Storage | — | Iron Springs Bess, Llc |
| 16.9 mi | Iron Springs Solar, Llc Cedar City, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 18.3 mi | Three Peaks Power Cedar City, UT | Solar | 80 MW | Onward Energy |
| 18.7 mi | Appaloosa Solar I Cedar City, UT | Solar | 200 MW | Greenbacker Renewable Energy Corporation |
| 19.0 mi | Quichapa 2 Cedar City, UT | Solar | 3 MW | Quichapa 2 Llc |
| 19.7 mi | Fremont Solar Wheatgrass, UT | Battery Storage | — | Fremont Solar, Llc |
| 20.5 mi | Fiddler's Canyon 3 Cedar City, UT | Solar | 3 MW | Sune Solar Xvii Project 3, Llc |
| 20.6 mi | Quichapa 1 Cedar City, UT | Solar | 3 MW | Quichapa 1 Llc |
| 21.6 mi | Granite Mountain Solar East, Llc Cedar City, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 21.8 mi | Quichapa 3 Cedar City, UT | Solar | 3 MW | Quichapa 3 Llc |
| 22.7 mi | Fiddler's Canyon #1 Cedar City, UT | Solar | 3 MW | Sune Solar Xvii Project 1, Llc |
| 23.3 mi | Buckhorn Solar Plant Paragonah, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 24.9 mi | Fiddler's Canyon #2 Cedar City, UT | Solar | 3 MW | Sune Solar Xvii Project 2, Llc |
| 27.0 mi | Granite Mountain Solar West, Llc Cedar City, UT | Solar | 50 MW | Clearway Renewable Operation & Maintenance Llc |
| 37.2 mi | Thermo Solar Pv-01 Milford, UT | Solar | — | Thermo No 1 Be 01 Llc |
| 37.2 mi | Thermo No 1 Milford, UT | Geothermal | 14 MW | Thermo No 1 Be 01 Llc |
| 39.0 mi | Greenville Solar Plant Milford, UT | Solar | 2 MW | Evergreen Wind, Llc |
| 39.0 mi | Smithfield 3 Milford, UT | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 41.1 mi | Blue Mountain Biogas Milford, UT | Biomass | 3 MW | Blue Mountain Biogas Llc |
| 41.9 mi | Milford Flat Solar Plant Milford, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 42.2 mi | Enterprise Solar, Llc Newcastle, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 42.3 mi | Laho Solar Plant Milford, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 42.7 mi | Cove Mountain Solar Beryl, UT | Solar | 58 MW | Cove Mountain Solar Llc |
| 43.3 mi | Hurricane City Power Hurricane, UT | Natural Gas | 15 MW | Hurricane City Power |
| 43.6 mi | Cove Mountain Solar 2 Beryl, UT | Solar | 122 MW | Cove Mountain Solar 2 Llc |
| 43.8 mi | South Milford Solar Plant Milford, UT | Solar | 3 MW | Reut Origination, Llc |
| 44.1 mi | Upper Beaver Beaver, UT | Hydroelectric | 3 MW | Beaver City Corporation |
| 44.1 mi | Beryl Solar Plant Beryl, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 44.2 mi | Red Butte Solar And Storage Newcastle, UT | Battery Storage | — | Brightnight Power |
| 45.3 mi | Quail Creek Hydro Plant #1 Hurricane, UT | Hydroelectric | 2 MW | Washington Cnty Wtr Consv Dist |
| 48.3 mi | Milford 2 Milford, UT | Solar | 3 MW | Sune Db24 Llc |
| 48.3 mi | Smithfield 1 Milford, UT | Solar | 5 MW | Greenbacker Renewable Energy Corporation |
| 49.3 mi | Granite Peak Solar Plant Milford, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 49.8 mi | Washington City Electric Generation Washington, UT | Natural Gas | 6 MW | City Of Washington - (Ut) |
Power generation near this area
There are 37 power plants within 50 miles of Brian Head, Utah (ZIP 84719), with a combined 925 MW of nameplate capacity. Solar is the most common fuel type in this area with 27 of the 37 nearby plants. The closest plant is Parowan Solar at 12.5 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Utah, visit the Utah state page.
← Search a different location · Printable proximity report →