Power Plants Near 95448 — Healdsburg, CA
50 power plants within 50 miles of ZIP 95448 (Healdsburg, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 38.6184, -122.8620 · County: Sonoma
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 2.4 mi | Dissigno Healdsburg FPV, LLC Healdsburg, CA | Solar | 3 MW | Palmetto Power Management LLC |
| 6.0 mi | Windsor Floating Solar Windsor, CA | Solar | 2 MW | CA Odevi LLC |
| 10.4 mi | Sutter Santa Rosa Solar Santa Rosa, CA | Solar | 1 MW | Sutter Santa Rosa Solar LLC |
| 10.8 mi | Warm Springs Hydro Project Geyserville, CA | Hydroelectric | 3 MW | Sonoma County Water Agency - (CA) |
| 11.6 mi | Asti Cloverdale, CA | Solar | 1 MW | SunStrong Management, LLC |
| 12.0 mi | Geothermal 1 Middletown, CA | Geothermal | 110 MW | Northern California Power Agny |
| 12.1 mi | Geothermal 2 Middletown, CA | Geothermal | 110 MW | Northern California Power Agny |
| 12.5 mi | Keysight - Santa Rosa Santa Rosa, CA | Natural Gas | 5 MW | Bloom Energy |
| 12.6 mi | Geysers Unit 5-20 Middletown, CA | Geothermal | 1,236 MW | Geysers Power Co LLC |
| 12.8 mi | Santa Rosa Junior College Petaluma Solar Petaluma, CA | Solar | 1 MW | Sonoma County Junior College District |
| 13.2 mi | Sonoma California Geothermal Middletown, CA | Geothermal | 78 MW | Geysers Power Co LLC |
| 13.3 mi | Calistoga Power Plant Middletown, CA | Geothermal | 176 MW | Geysers Power Co LLC |
| 13.5 mi | Cloverdale Solar Center Cloverdale, CA | Solar | 1 MW | Adapture Renewables, Inc. |
| 13.5 mi | Bear Canyon Middletown, CA | Battery Storage | 13 MW | Bear Canyon Energy Storage |
| 13.6 mi | Cloverdale Solar I Cloverdale, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 14.0 mi | West Ford Flat Middletown, CA | Battery Storage | 25 MW | West Ford Flat Energy Storage |
| 14.9 mi | Aidlin Geothermal Power Plant Middletown, CA | Geothermal | 25 MW | Geysers Power Co LLC |
| 15.8 mi | Bottle Rock Power Cobb, CA | Geothermal | 55 MW | Mayacma Geothermal |
| 16.0 mi | Calistoga Resilency Center Calistoga, CA | Battery Storage | 19 MW | Calistoga Resiliency Center, LLC |
| 18.0 mi | Laguna Water Reclamation Facility Santa Rosa, CA | Biomass | 4 MW | City of Santa Rosa - (CA) |
| 21.9 mi | Beringer Saint Helena, CA | Solar | 1 MW | SunStrong Management, LLC |
| 22.7 mi | Sonoma Central Landfill Phase I Petaluma, CA | Biomass | 3 MW | County of Sonoma Dept of Trnsp |
| 22.7 mi | Sonoma Central Landfill Phase II Petaluma, CA | Biomass | 3 MW | County of Sonoma Dept of Trnsp |
| 22.7 mi | Sonoma Central Landfill Phase III Petaluma, CA | Biomass | 2 MW | County of Sonoma Dept of Trnsp |
| 22.8 mi | Pacific Union College BESS Angwin, CA | Other Fossil | 1 MW | ENGIE Storage Services NA LLC |
| 25.6 mi | Bodega Avenue Solar LLC Petaluma, CA | Solar | 2 MW | Bodega Avenue Solar LLC |
| 26.4 mi | Clear Lake Hydro Project Clearlake, CA | Hydroelectric | 3 MW | Yolo County Flood Control WCD |
| 28.8 mi | Kama 1 LLC Hopland, CA | Battery Storage | 2 MW | Standard Solar |
| 31.2 mi | Lavio Solar Petaluma, CA | Solar | 1 MW | Lavio Solar, LLC |
| 31.5 mi | Ellis Creek Solar Petaluma, CA | Solar | 4 MW | Ellis Creek Solar, LLC |
| 32.7 mi | Stage Gulch Solar Petaluma, CA | Solar | 1 MW | Stage Gulch Solar, LLC |
| 35.5 mi | Waste Mangement Redwood LFGTE Novato, CA | Biomass | 4 MW | WM Renewable Energy LLC |
| 35.9 mi | Silveira Ranch Road Solar Novato, CA | Solar | 3 MW | Silveira Ranch Road Solar |
| 36.3 mi | Indian Valley Dam Hydro Project Clearlake Oaks, CA | Hydroelectric | 3 MW | Yolo County Flood Control WCD |
| 37.3 mi | Cottonwood Solar, LLC Cottonwood Carport Novato, CA | Solar | 1 MW | Onward Energy |
| 40.6 mi | Kaiser Napa Valley Corporate Dr Fuel Cel Napa, CA | Natural Gas | 5 MW | 2016 ESA Project Company, LLC |
| 41.3 mi | Soscol Ferry Solar Napa, CA | Solar | 2 MW | Soscol Ferry Solar |
| 41.6 mi | Monticello Dam Winters, CA | Hydroelectric | 12 MW | Solano Irrigation District |
| 42.8 mi | Redemeyer Road Solar Ukiah, CA | Battery Storage | 8 MW | RPCA Solar 10, LLC |
| 43.6 mi | Lake Mendocino Ukiah, CA | Hydroelectric | 4 MW | City of Ukiah - (CA) |
| 43.9 mi | Sutter Home Winery GIR American Canyon, CA | Solar | 1 MW | Westbound Solar 3, LLC |
| 47.2 mi | American Canyon Solar American Canyon, CA | Solar | 3 MW | RP Napa Solar 1, LLC |
| 47.3 mi | Putah Creek Solar Farm North Winters, CA | Solar | 3 MW | Putah Creek Solar Farms LLC |
| 47.4 mi | Putah Creek Solar Farm Winters, CA | Solar | 2 MW | Solvida Energy Group/Blue Oak Energy |
| 47.9 mi | SFDK Solar Vallejo, CA | Solar | 6 MW | AES Distributed Energy |
| 49.3 mi | Anheuser Busch - Fairfield Fairfield, CA | Natural Gas | 3 MW | Bloom Energy |
| 49.4 mi | Anheuser-Busch #2 Fairfield, CA | Wind | 2 MW | Foundation HA Energy Generation, LLC |
| 49.5 mi | Foundation AB Fairfield, CA | Wind | 2 MW | Foundation HA Energy Generation, LLC |
| 49.5 mi | SunEdison Anheuser Busch Fairfield Fairfield, CA | Solar | 1 MW | SunE M5 Holdings LLC |
| 50.0 mi | ATT North Watney Fairfield, CA | Natural Gas | 2 MW | Bloom Energy |
Power generation near this area
There are 50 power plants within 50 miles of Healdsburg, California (ZIP 95448), with a combined 1,958 MW of nameplate capacity. Solar is the most common fuel type in this area with 21 of the 50 nearby plants. The closest plant is Dissigno Healdsburg FPV, LLC at 2.4 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →