Power Plants Near 97390 — Tidewater, OR
14 power plants within 50 miles of ZIP 97390 (Tidewater, Oregon). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 44.4055, -123.9149 · County: Lincoln
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 14.3 mi | Georgia-Pacific Toledo Mill Toledo, OR | Biomass | 19 MW | Georgia-Pacific Toledo LLC |
| 31.7 mi | Oregon University System Rabbit Field Corvallis, OR | Solar | 1 MW | Tesla Inc. |
| 32.7 mi | Oregon State University Energy Center Corvallis, OR | Natural Gas | 6 MW | Oregon State University |
| 38.5 mi | Shell New Energies, Junction City Junction City, OR | Biomass | 2 MW | Equilon Enterprises LLC d/b/a Shell Oil |
| 39.6 mi | Coffin Butte Corvallis, OR | Biomass | 6 MW | Pacific Northwest Generating Coop |
| 41.5 mi | Seneca Sustainable Energy LLC Eugene, OR | Biomass | 20 MW | Seneca Sustainable Energy LLC |
| 44.6 mi | Burlingame Solar Community Solar Brownsville, OR | Solar | 2 MW | Burlingame Solar, LLC |
| 46.7 mi | Marble Solar LLC (CSG) Albany, OR | Solar | 3 MW | SolRiver Capital LLC |
| 47.2 mi | Grand Ronde Solar Grand Ronde, OR | Solar | 2 MW | SunStrong Management |
| 47.8 mi | Orchard Knob Dallas, OR | Solar | 2 MW | Orchard Knob Solar LLC |
| 48.4 mi | Univ of Oregon Central Power Station Eugene, OR | Natural Gas | 21 MW | University of Oregon |
| 48.6 mi | Waterford Solar, LLC CSG Willamina, OR | Solar | 3 MW | Waterford Solar LLC |
| 49.5 mi | Cosper Creek Solar (CSG) Willamina, OR | Solar | 3 MW | Cosper Creek Solar, LLC |
| 49.5 mi | Apricus Solar LLC Willamina, OR | Solar | 3 MW | KSI III Consolidated, LLC |
Power generation near this area
There are 14 power plants within 50 miles of Tidewater, Oregon (ZIP 97390), with a combined 90 MW of nameplate capacity. Solar is the most common fuel type in this area with 8 of the 14 nearby plants. The closest plant is Georgia-Pacific Toledo Mill at 14.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oregon, visit the Oregon state page.
← Search a different location · Printable proximity report →