Barnes County, North Dakota has 3 power plants totaling 259 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Fpl Energy Ashtabula Wind Llc | Luverne | Wind | 149 MW | Fpl Energy Ashtabula Wind Llc |
| Ashtabula Wind Iii Llc | Luverne | Wind | 62.4 MW | Otter Tail Power Co |
| Ashtabula Wind Energy Center | Luverne | Wind | 48.0 MW | Otter Tail Power Co |
Barnes County, North Dakota has 3 power plants totaling 259 MW of nameplate capacity. Wind is the dominant fuel source at 100% of installed capacity. The largest facility is Fpl Energy Ashtabula Wind Llc at 148 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Barnes County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.