Electric generating plantEIA plant no. 56919

FPL Energy Ashtabula Wind LLC

Type
Onshore Wind Turbine
Nameplate capacity
149 MW
Units
1
In service since
2008
Operator
FPL Energy Ashtabula Wind LLC
Location
Luverne, Barnes County, North Dakota
Rated 27th largest in North Dakota · 2187th of 14,761 in the U.S. · by nameplate

FPL Energy Ashtabula Wind LLC is a wind power plant in North Dakota with a nameplate capacity of 149 MW. It generates roughly 561.6k MWh per year — enough to power about 53,487 average U.S. homes.

Its capacity factor of 43% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, FPL Energy Ashtabula Wind LLC could make 1.3M MWh. In 2023 it made 561.6k MWh — the same as running at full power 43 hours in every 100.

Nameplate, full year1.3M MWh149 MW × 8,760 hours
Actually generated561.6k MWhEPA eGRID, 2023 · ≈53,487 homes

Mid-meritCapacity factor 43%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Wind

Location

Address12306 20th Street NE
CityLuverne
CountyBarnes County
StateNorth Dakota
ZIP58056
Coordinates47.12940, -97.88530
OperatorFPL Energy Ashtabula Wind LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GE15Onshore Wind TurbineWind149 MWOperating2008

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Barnes County

View all plants in Barnes County →

Explore more