2081 Terzian Solar Project

☀ SolarIPP Non-CHP1 MW capacity

1630th largest plant in California · 12336th nationally

2081 Terzian Solar Project is a solar power plant in California with a nameplate capacity of 1.2 MW. It generates roughly 2.0k MWh per year — enough to power about 192 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%19%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation2.0k MWhEPA eGRID
Capacity Factor19%of theoretical max
Annual CO₂metric tons

Location

Plant Name2081 Terzian Solar Project
OperatorSolarenewal Llc
CityReedley
CountyFresno County
StateCalifornia
ZIP93654
Coordinates36.67000, -119.41583

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
2081Solar PhotovoltaicSolar1.2 MWOperating2014

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.