Electric generating plantEIA plant no. 58039

Axium Modesto Solar

Type
Solar Photovoltaic
Nameplate capacity
25.0 MW
Units
1
In service since
2012
Operator
Axium US Solar Holdings LLC
Location
Modesto, Stanislaus County, California
Rated 609th largest in California · 4747th of 14,761 in the U.S. · by nameplate

Axium Modesto Solar is a solar power plant in California with a nameplate capacity of 25.0 MW. It generates roughly 53.7k MWh per year — enough to power about 5,117 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Axium Modesto Solar could make 219.0k MWh. In 2023 it made 53.7k MWh — the same as running at full power 25 hours in every 100.

Nameplate, full year219.0k MWh25.0 MW × 8,760 hours
Actually generated53.7k MWhEPA eGRID, 2023 · ≈5,117 homes

Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolarBiomassBattery Storage

Location

Address6800 McHenry Avenue
CityModesto
CountyStanislaus County
StateCalifornia
ZIP95356
Coordinates37.73417, -120.99556
OperatorAxium US Solar Holdings LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar25.0 MWOperating2012

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Stanislaus County

View all plants in Stanislaus County →

Data centers near Axium Modesto Solar

Data centerOperatorDistance
Modesto Junior College West Data CenterYosemite Community College District5.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map