BCE Los Alamitos 2 is a solar power plant in California with a nameplate capacity of 20.0 MW. It generates roughly 3.4k MWh per year — enough to power about 322 average U.S. homes.
Its capacity factor of 2% reflects intermittent or peaking operation.
Run flat out every hour of the year, BCE Los Alamitos 2 could make 175.2k MWh. In 2023 it made 3.4k MWh — the same as running at full power 2 hours in every 100.
Peaking or variableCapacity factor 2%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 11206 Lexington Dr |
|---|---|
| City | Los Alamitos |
| County | Orange County |
| State | California |
| ZIP | 90720 |
| Coordinates | 33.78410, -118.05090 |
| Operator | Bright Canyon Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| BCE21 | Solar Photovoltaic | Solar | 10.0 MW | Operating | 2023 |
| BCE22 | Batteries | Battery | 10.0 MW | Operating | 2023 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.