Blazing Star 2 Wind Farm is a wind power plant in Minnesota with a nameplate capacity of 200 MW. It generates roughly 816.8k MWh per year — enough to power about 77,791 average U.S. homes.
Its capacity factor of 47% puts it in the middle range — running steadily but not full-time.
Run flat out every hour of the year, Blazing Star 2 Wind Farm could make 1.8M MWh. In 2023 it made 816.8k MWh — the same as running at full power 47 hours in every 100.
Mid-meritCapacity factor 47%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | County Road 102 |
|---|---|
| City | Hendricks |
| County | Lincoln County |
| State | Minnesota |
| ZIP | 56136 |
| Coordinates | 44.44529, -96.35276 |
| Operator | Northern States Power Co - Minnesota |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| BLZS2 | Onshore Wind Turbine | Wind | 200 MW | Operating | 2021 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.