Electric generating plantEIA plant no. 62950

Bluestone Solar

Type
Solar Photovoltaic
Nameplate capacity
49.9 MW
Units
1
In service since
2021
Operator
Bluestone Farm Solar, LLC
Location
Chase City, Mecklenburg County, Virginia
Rated 84th largest in Virginia · 4017th of 14,761 in the U.S. · by nameplate

Bluestone Solar is a solar power plant in Virginia with a nameplate capacity of 49.9 MW. It generates roughly 70.3k MWh per year — enough to power about 6,696 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Bluestone Solar could make 437.1k MWh. In 2023 it made 70.3k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year437.1k MWh49.9 MW × 8,760 hours
Actually generated70.3k MWhEPA eGRID, 2023 · ≈6,696 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalHydroelectricSolarBiomass

Location

Address2918 Spanish Grove Road
CityChase City
CountyMecklenburg County
StateVirginia
ZIP23924
Coordinates36.81153, -78.48391
OperatorBluestone Farm Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BLUE1Solar PhotovoltaicSolar49.9 MWOperating2021

Grid context

NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Mecklenburg County

View all plants in Mecklenburg County →

Data centers near Bluestone Solar

Data centerOperatorDistance
Data center, BoydtonNot recorded10.1 mi
Data center, BoydtonNot recorded10.3 mi
Data center, BoydtonNot recorded10.5 mi
Data center, BoydtonNot recorded10.7 mi
Data center, BoydtonNot recorded10.9 mi
Data center, BoydtonNot recorded11.0 mi
Data center, BoydtonNot recorded11.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more