Electric generating plantEIA plant no. 62813

Grasshopper Solar

Type
Solar Photovoltaic
Nameplate capacity
80.0 MW
Units
1
In service since
2020
Operator
Dominion Energy Inc.
Location
Chase City, Mecklenburg County, Virginia
Rated 57th largest in Virginia · 3106th of 14,761 in the U.S. · by nameplate

Grasshopper Solar is a solar power plant in Virginia with a nameplate capacity of 80.0 MW. It generates roughly 147.2k MWh per year — enough to power about 14,019 average U.S. homes.

Its capacity factor of 21% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Grasshopper Solar could make 700.8k MWh. In 2023 it made 147.2k MWh — the same as running at full power 21 hours in every 100.

Nameplate, full year700.8k MWh80.0 MW × 8,760 hours
Actually generated147.2k MWhEPA eGRID, 2023 · ≈14,019 homes

Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalHydroelectricSolar

Location

Address29172 Highway 49
CityChase City
CountyMecklenburg County
StateVirginia
ZIP23924
Coordinates36.85000, -78.45000
OperatorDominion Energy Inc.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GRHSSolar PhotovoltaicSolar80.0 MWOperating2020

Grid context

NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Mecklenburg County

View all plants in Mecklenburg County →

Data centers near Grasshopper Solar

Data centerOperatorDistance
Data center, BoydtonNot recorded11.6 mi
Data center, BoydtonNot recorded11.8 mi
Data center, BoydtonNot recorded12.0 mi
Data center, BoydtonNot recorded12.2 mi
Data center, BoydtonNot recorded12.5 mi
Data center, BoydtonNot recorded12.6 mi
Data center, BoydtonNot recorded12.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more